Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of installation of a new backup generator and battery system to provide reliable emergency power for the Cloverdale veterans memorial building.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work consists of installation of a new backup generator and battery system to provide reliable emergency power for the Cloverdale veterans memorial building.
Posted Date
Nov 18, 2025
Due Date
Dec 16, 2025
Release: Nov 18, 2025
Close: Dec 16, 2025
Work consists of installation of a new backup generator and battery system to provide reliable emergency power for the Cloverdale veterans memorial building.
AvailablePremium
Access the largest public sector contact database
Replacement of the existing chiller system at veterans memorial high school cte building. The project includes demolition, equipment removal, installation of a new chiller, associated mechanical, electrical, and control systems, and all related work for a complete and functional system.
Posted Date
Nov 12, 2025
Due Date
Dec 11, 2025
Release: Nov 12, 2025
Close: Dec 11, 2025
Replacement of the existing chiller system at veterans memorial high school cte building. The project includes demolition, equipment removal, installation of a new chiller, associated mechanical, electrical, and control systems, and all related work for a complete and functional system.
The Town of North Haven seeks proposals for obtaining, installing, testing, and warranting a facility generator for the North Haven Memorial Library. The project requires a complete 'turnkey' system, including site, installation, gas, and electrical work, to ensure the generator can power the entire facility during outages. Compliance with Connecticut's prevailing wage laws and state set-aside requirements is mandatory.
Posted Date
-
Due Date
Dec 12, 2025
Close: Dec 12, 2025
The Town of North Haven seeks proposals for obtaining, installing, testing, and warranting a facility generator for the North Haven Memorial Library. The project requires a complete 'turnkey' system, including site, installation, gas, and electrical work, to ensure the generator can power the entire facility during outages. Compliance with Connecticut's prevailing wage laws and state set-aside requirements is mandatory.
The Town of North Haven seeks proposals for obtaining, installing, testing, and warranting a facility generator for the North Haven Memorial Library. The project requires a complete 'turnkey' system, including site, installation, gas, and electrical work, to ensure the generator can power the entire facility during outages. Compliance with Connecticut's prevailing wage laws and state set-aside requirements is mandatory.
Posted Date
-
Due Date
Dec 12, 2025
Close: Dec 12, 2025
The Town of North Haven seeks proposals for obtaining, installing, testing, and warranting a facility generator for the North Haven Memorial Library. The project requires a complete 'turnkey' system, including site, installation, gas, and electrical work, to ensure the generator can power the entire facility during outages. Compliance with Connecticut's prevailing wage laws and state set-aside requirements is mandatory.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis