Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Miami-Dade County (DTPW) is soliciting a contractor to apply green paint at keyholes and conflict points on existing bike lanes along SW 160th Street and SW 142nd Avenue, including associated pavement markings and signing. Bidders must hold the appropriate Certificate of Competency, demonstrate experience with similar projects, and provide required insurance and references.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Miami-Dade County seeks contractors for implementing green paint at keyholes and conflict points on existing bike lanes to enhance pedestrian and bicycle mobility. The project includes pavement markings and signing, with a requirement for General Engineering, Paving, and Painting licenses.
Posted Date
-
Due Date
Dec 31, 2025
Close: Dec 31, 2025
Miami-Dade County seeks contractors for implementing green paint at keyholes and conflict points on existing bike lanes to enhance pedestrian and bicycle mobility. The project includes pavement markings and signing, with a requirement for General Engineering, Paving, and Painting licenses.
Premium
Access the largest public sector contact database
Work include replacing approximately 2,990 SY of non-compliant ADA sidewalks and curb ramps with new ADA compliant sidewalks and curb ramps. Project items include curb and gutter replacement, ornamental brick/stone seat walls, ornamental metal benches, metal trash receptacles, storm drain inlet modifications, water meter resets, site lighting, parking/ADA re-striping, and associated temporary traffic control.
Posted Date
Nov 25, 2025
Due Date
Dec 17, 2025
Release: Nov 25, 2025
Close: Dec 17, 2025
Work include replacing approximately 2,990 SY of non-compliant ADA sidewalks and curb ramps with new ADA compliant sidewalks and curb ramps. Project items include curb and gutter replacement, ornamental brick/stone seat walls, ornamental metal benches, metal trash receptacles, storm drain inlet modifications, water meter resets, site lighting, parking/ADA re-striping, and associated temporary traffic control.
AvailableThe City of Doniphan, Missouri is soliciting bids for construction of new sidewalks along portions of Highway Street and Walnut Street in the Southeast District. Bids close on December 12, 2025 at 11:00 AM EST.
Posted Date
Nov 14, 2025
Due Date
Dec 12, 2025
Release: Nov 14, 2025
Close: Dec 12, 2025
The City of Doniphan, Missouri is soliciting bids for construction of new sidewalks along portions of Highway Street and Walnut Street in the Southeast District. Bids close on December 12, 2025 at 11:00 AM EST.
1,860 SF cold milling (t=2in min); 52 CY unclassified excavation, including haul away; adjust maintenance hole to grade; 24 ton asphalt concrete pavement (Base and AC wearing surface) (t=6").
Posted Date
Dec 4, 2025
Due Date
Jan 14, 2026
Release: Dec 4, 2025
Close: Jan 14, 2026
1,860 SF cold milling (t=2in min); 52 CY unclassified excavation, including haul away; adjust maintenance hole to grade; 24 ton asphalt concrete pavement (Base and AC wearing surface) (t=6").
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis