Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Dayton
Project consists of renovations to the pool, includes demolition of various pool related systems, equipment, and finishes. New work items consisting of pool equipment, plumbing, electrical, and miscellaneous improvements to the natatorium. See the outside links for more details.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Western Wyoming Community College
Western Wyoming Community College District seeks sealed bids for a Pool Locker Room Renovation at its Rock Springs campus and has scheduled a bidders conference for December 12, 2025. All bids are due by 1:00 p.m. on January 6, 2026; the primary posting is on the buyer's PublicPurchase page but documents require login to access.
Posted Date
Nov 21, 2025
Due Date
Jan 6, 2026
Release: Nov 21, 2025
Western Wyoming Community College
Close: Jan 6, 2026
Western Wyoming Community College District seeks sealed bids for a Pool Locker Room Renovation at its Rock Springs campus and has scheduled a bidders conference for December 12, 2025. All bids are due by 1:00 p.m. on January 6, 2026; the primary posting is on the buyer's PublicPurchase page but documents require login to access.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Highland Park Park District
Provide park fitness locker room renovation.
Posted Date
Nov 14, 2025
Due Date
Dec 19, 2025
Release: Nov 14, 2025
Highland Park Park District
Close: Dec 19, 2025
Provide park fitness locker room renovation.
AvailableSacramento Area Sewer District
Expansion and remodel of the Men's Locker Room in the I&E building [includes, but is not limited to: new lockers, floors, bathrooms, showers, uniform storage, and HVAC improvements.]
Posted Date
Oct 24, 2025
Due Date
Dec 9, 2025
Release: Oct 24, 2025
Sacramento Area Sewer District
Close: Dec 9, 2025
Expansion and remodel of the Men's Locker Room in the I&E building [includes, but is not limited to: new lockers, floors, bathrooms, showers, uniform storage, and HVAC improvements.]
AvailableCity of Springfield
Work includes 50 CY removal and disposal of unsuitable material; 5.4 CY trench backfill; 614 unit supplemental watering' 962 sy subbase granular material, type a 4"; 228 ton subbase granular material, type c; 88 pound bituminous materials (tack coat); 44 ton hot-mix asphalt surface course, il- 9.5, mix "d", n50; 146 SY portland cement concrete pavement 7" (jointed); 712 SY portland cement concrete pavement 8" (jointed); 923 SY protective coat; 2,747 SF portland cement concrete sidewalk 4"; 1,047 SY pavement removal; 392 SY hot-mix asphalt surface removal, 2"; 4 CY concrete structures; 2 LF storm sewer removal 12". See attached file.
Posted Date
Feb 20, 2025
Due Date
Dec 18, 2025
Release: Feb 20, 2025
City of Springfield
Close: Dec 18, 2025
Work includes 50 CY removal and disposal of unsuitable material; 5.4 CY trench backfill; 614 unit supplemental watering' 962 sy subbase granular material, type a 4"; 228 ton subbase granular material, type c; 88 pound bituminous materials (tack coat); 44 ton hot-mix asphalt surface course, il- 9.5, mix "d", n50; 146 SY portland cement concrete pavement 7" (jointed); 712 SY portland cement concrete pavement 8" (jointed); 923 SY protective coat; 2,747 SF portland cement concrete sidewalk 4"; 1,047 SY pavement removal; 392 SY hot-mix asphalt surface removal, 2"; 4 CY concrete structures; 2 LF storm sewer removal 12". See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →