Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Bossier City
Building Renovation.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
U.S. Army Engineer District FT Worth
B6413 Building Renovation Secure Space.
Posted Date
Nov 21, 2025
Due Date
Dec 17, 2025
Release: Nov 21, 2025
U.S. Army Engineer District FT Worth
Close: Dec 17, 2025
B6413 Building Renovation Secure Space.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
U.S. Army Engineer District FT Worth
Work includes Demolition / Abatement; Cast-In-Place Concrete; Masonry; Structural Steel; Architectural Woodwork; Waterproofing; Fireproofing; Firestopping; Metal Roofing; Glass & Glazing; Doors, Frames, and Hardware; Gypsum Board Systems; Flooring; Painting; Specialties; Window Treatment; RF Shielding; Elevators; Fire Protection; Mechanical; Electrical; Earthwork; Asphalt Paving; see outside link.
Posted Date
Feb 21, 2025
Due Date
Nov 26, 2025
Release: Feb 21, 2025
U.S. Army Engineer District FT Worth
Close: Nov 26, 2025
Work includes Demolition / Abatement; Cast-In-Place Concrete; Masonry; Structural Steel; Architectural Woodwork; Waterproofing; Fireproofing; Firestopping; Metal Roofing; Glass & Glazing; Doors, Frames, and Hardware; Gypsum Board Systems; Flooring; Painting; Specialties; Window Treatment; RF Shielding; Elevators; Fire Protection; Mechanical; Electrical; Earthwork; Asphalt Paving; see outside link.
AvailableWestfield Gas & Electric
Performing interior renovations to their existing facility. The renovation consists of the installation of new office and warehouse space which will include complete fit-out of a newly constructed steel framed pre-engineered building ADA bathrooms, storage area and all site development work including earthwork and site improvements.
Posted Date
Nov 5, 2025
Due Date
Dec 10, 2025
Release: Nov 5, 2025
Westfield Gas & Electric
Close: Dec 10, 2025
Performing interior renovations to their existing facility. The renovation consists of the installation of new office and warehouse space which will include complete fit-out of a newly constructed steel framed pre-engineered building ADA bathrooms, storage area and all site development work including earthwork and site improvements.
AvailableHennepin County
Work includes building repair & renovation services on an as needed / requested basis.
Posted Date
Nov 18, 2025
Due Date
Dec 16, 2025
Release: Nov 18, 2025
Hennepin County
Close: Dec 16, 2025
Work includes building repair & renovation services on an as needed / requested basis.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →