Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Union County
Union County (through Union County Water) solicits proposals for removal, transportation, and disposal of sludge from backwash basins at the Yadkin River Water Treatment Plant, including mobilization/demobilization, dewatering/decanting coordination, and regulatory compliance documentation. The contract covers a three-year period with services scheduled as needed and requires appropriate permits, insurance, and a satisfactory safety record.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Union County
Union County (through Union County Water) solicits proposals for removal, transportation, and disposal of sludge from backwash basins at the Yadkin River Water Treatment Plant, including mobilization/demobilization, dewatering/decanting coordination, and regulatory compliance documentation. The contract covers a three-year period with services scheduled as needed and requires appropriate permits, insurance, and a satisfactory safety record.
Posted Date
Nov 21, 2025
Due Date
Dec 19, 2025
Release: Nov 21, 2025
Union County
Close: Dec 19, 2025
Union County (through Union County Water) solicits proposals for removal, transportation, and disposal of sludge from backwash basins at the Yadkin River Water Treatment Plant, including mobilization/demobilization, dewatering/decanting coordination, and regulatory compliance documentation. The contract covers a three-year period with services scheduled as needed and requires appropriate permits, insurance, and a satisfactory safety record.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Athens
Provide sludge removal and disposal services, including licenses, permitting, labor, equipment, parts, materials, testing or other incidental work for the removal of accumulated solids from a water treatment plant sludge lagoon.
Posted Date
Nov 19, 2025
Due Date
Dec 4, 2025
Release: Nov 19, 2025
City of Athens
Close: Dec 4, 2025
Provide sludge removal and disposal services, including licenses, permitting, labor, equipment, parts, materials, testing or other incidental work for the removal of accumulated solids from a water treatment plant sludge lagoon.
AvailableSt. John the Baptist Parish
Provide wastewater treatment plant aeration basin rehabilitation and grit system replacement. The aeration basin air system requires a full rehabilitation. The scope of work includes: dewatering, removing and disposing the accumulated sludge, and cleaning all four cells of the aeration basin; complete replacement of all air distribution system in all four cells of the aeration basin. Once initial cleaning is complete, all remaining metal piping, fittings, and valves from the blowers to the new joints on the drop pipes in the aeration basin will be blast-cleaned and repainted. Due to the current inaccessibility of the filled cells, additional repairs to pedestals, tank walls, and floors may be required. See attached file.
Posted Date
Nov 19, 2025
Due Date
Dec 19, 2025
Release: Nov 19, 2025
St. John the Baptist Parish
Close: Dec 19, 2025
Provide wastewater treatment plant aeration basin rehabilitation and grit system replacement. The aeration basin air system requires a full rehabilitation. The scope of work includes: dewatering, removing and disposing the accumulated sludge, and cleaning all four cells of the aeration basin; complete replacement of all air distribution system in all four cells of the aeration basin. Once initial cleaning is complete, all remaining metal piping, fittings, and valves from the blowers to the new joints on the drop pipes in the aeration basin will be blast-cleaned and repainted. Due to the current inaccessibility of the filled cells, additional repairs to pedestals, tank walls, and floors may be required. See attached file.
AvailableCity of Lake Charles
Work includes wastewater treatment plant b/c sludge processing improvements.
Posted Date
Nov 7, 2025
Due Date
Dec 16, 2025
Release: Nov 7, 2025
City of Lake Charles
Close: Dec 16, 2025
Work includes wastewater treatment plant b/c sludge processing improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →