Retrieving RFP details
Release
Close
City of Lake Charles
Work includes wastewater treatment plant b/c sludge processing improvements.
Town of Alma
The Project includes the following Work: Construction of a new centralized wastewater treatment plant including new headworks, grit removal, process building (pre-engineered metal building), secondary treatment process and associated concrete basins, aeration system, blowers, lift station, UV disinfection system, and all necessary ancillary piping, electrical, controls, earthwork, and biosolids removal and disposal.
City of Lindale
Proposed project consists of wastewater treatment plant improvements. Work shall include the construction of a 0.75 MGD extended aeration facility with two parallel treatment trains, clarifiers, UV disinfection, an aerated sludge holding tank, belt filter press, laboratory, various appurtenant buildings and pump stations, limited demolition of existing facilities, mass earthwork, installation of yard piping, paving, electrical facilities, SCADA system, and emergency power stations. See attached file.
City of Parlier
Work consist of replacement of an existing aerated lagoon wastewater treatment plant and a new extended aeration treatment facility.
Release
Nov 07, 2025
Close
Dec 02, 2025