Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Phase I RFQ requesting architectural design professional services for a new jail addition (160-bed male unit and 128-bed female unit) under a Construction Manager at Risk delivery. Scope includes full architectural design (concept through construction documents), construction administration, MEP/structural coordination, FF&E/layout, and commissioning. Estimated construction cost ~$55,000,000. Responding firms must perform ≥75% of architectural design in-house and demonstrate relevant public-safety/corrections and CM/GC experience.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Bulloch County Board of Commissioners is soliciting statements of qualifications from architecture firms for Phase I of a new jail addition project, including design development, construction documents, and construction administration for a 160-bed male and 128-bed female housing unit. The project is estimated at $55,000,000, will use a CMAR delivery method, and the county encourages minority- and woman-owned firms to participate.
Posted Date
Nov 17, 2025
Due Date
Dec 19, 2025
Release: Nov 17, 2025
Close: Dec 19, 2025
Bulloch County Board of Commissioners is soliciting statements of qualifications from architecture firms for Phase I of a new jail addition project, including design development, construction documents, and construction administration for a 160-bed male and 128-bed female housing unit. The project is estimated at $55,000,000, will use a CMAR delivery method, and the county encourages minority- and woman-owned firms to participate.
AvailableProvide Architectural and Engineering Professional Design Services for the Wenatchee High School Replacement Project. The project consists of a phased replacement of the existing Wenatchee High School on the same site as the current facility (new-in-lieu).
Posted Date
Nov 18, 2025
Due Date
Jan 6, 2026
Release: Nov 18, 2025
Close: Jan 6, 2026
Provide Architectural and Engineering Professional Design Services for the Wenatchee High School Replacement Project. The project consists of a phased replacement of the existing Wenatchee High School on the same site as the current facility (new-in-lieu).
AvailableProcurement of architectural (non-design/predesign/consulting) professional services to develop an Infrastructure Plan for UMore Park, encompassing transportation network planning and utility planning for water, sanitary sewer, stormwater, electrical, natural gas, and telecommunications infrastructure.
Posted Date
Nov 13, 2025
Due Date
Dec 15, 2025
Release: Nov 13, 2025
Close: Dec 15, 2025
Procurement of architectural (non-design/predesign/consulting) professional services to develop an Infrastructure Plan for UMore Park, encompassing transportation network planning and utility planning for water, sanitary sewer, stormwater, electrical, natural gas, and telecommunications infrastructure.
Request for architectural and engineering professional design services for the infrastructure renewal of the 82,805 SF Food Science and Nutrition Building, including mechanical and electrical systems, fire suppression, ceilings, lighting, restrooms, accessibility upgrades, masonry, windows, and roof replacement.
Posted Date
Nov 25, 2025
Due Date
Dec 16, 2025
Release: Nov 25, 2025
Close: Dec 16, 2025
Request for architectural and engineering professional design services for the infrastructure renewal of the 82,805 SF Food Science and Nutrition Building, including mechanical and electrical systems, fire suppression, ceilings, lighting, restrooms, accessibility upgrades, masonry, windows, and roof replacement.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis