Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Renovation of the old Middle School which will house four different school programs. The Work includes, but is not limited to site, structural, architectural, plumbing, mechanical, and electrical systems.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The City of New Orleans issued an Invitation To Bid (ITB) for the Norman Playground Basketball Shelter Renovations (Re-Bid) with an estimated value between $50,000 and $150,000. Bids are due Dec. 30, 2025 and the listing is shown as open with a link to the buyer's supplier portal for the original posting.
Posted Date
Nov 18, 2025
Due Date
Dec 30, 2025
Release: Nov 18, 2025
Close: Dec 30, 2025
The City of New Orleans issued an Invitation To Bid (ITB) for the Norman Playground Basketball Shelter Renovations (Re-Bid) with an estimated value between $50,000 and $150,000. Bids are due Dec. 30, 2025 and the listing is shown as open with a link to the buyer's supplier portal for the original posting.
Premium
Access the largest public sector contact database
Design/build General Services Center Renovations The project will be bid under a single Prime Contract with the General Contractor awarded the job providing licensed/certified electrical, HVAC, plumbing and other work as needed. The project involves the repair and/or replacement of windows (Number to be determined based on price & funding available), selective demolition of interior systems, partitions, and finishes, installation of new HVAC systems, modification of existing plumbing and electrical systems, and the installation of new partitions and finishes.
Posted Date
Nov 19, 2025
Due Date
Dec 16, 2025
Release: Nov 19, 2025
Close: Dec 16, 2025
Design/build General Services Center Renovations The project will be bid under a single Prime Contract with the General Contractor awarded the job providing licensed/certified electrical, HVAC, plumbing and other work as needed. The project involves the repair and/or replacement of windows (Number to be determined based on price & funding available), selective demolition of interior systems, partitions, and finishes, installation of new HVAC systems, modification of existing plumbing and electrical systems, and the installation of new partitions and finishes.
AvailableThe work involves the interior renovation of 4 grouped Boys and Girls restrooms, a staff toilet room, and water fountains. The work includes slab demolition for replacing and relocating toilet fixtures and piping, replacing toilet partitions and accessories, updating finishes, ceilings, mechanical grilles, electrical and light fixtures, and providing code compliant interior graphics / branding elements at the restroom entrances and other Work indicated in the Contract Documents.
Posted Date
-
Due Date
Dec 18, 2025
Close: Dec 18, 2025
The work involves the interior renovation of 4 grouped Boys and Girls restrooms, a staff toilet room, and water fountains. The work includes slab demolition for replacing and relocating toilet fixtures and piping, replacing toilet partitions and accessories, updating finishes, ceilings, mechanical grilles, electrical and light fixtures, and providing code compliant interior graphics / branding elements at the restroom entrances and other Work indicated in the Contract Documents.
AvailableWork includes, a. Convert (2) existing bedrooms to ADA Toilet Rooms. b. Convert (2) existing toilet rooms with showers into storage and janitor storage. c. Develop storage room in existing kitchen area. d. Install new ADA parking. e. Construct new free-standing covered open pavilion (Add Alternate #1). f. Upgrade Architectural finishes: 1) Flooring and wall base. 2) Lighting. 3) Painting. 4) Door Hardware.
Posted Date
Nov 13, 2025
Due Date
Dec 15, 2025
Release: Nov 13, 2025
Close: Dec 15, 2025
Work includes, a. Convert (2) existing bedrooms to ADA Toilet Rooms. b. Convert (2) existing toilet rooms with showers into storage and janitor storage. c. Develop storage room in existing kitchen area. d. Install new ADA parking. e. Construct new free-standing covered open pavilion (Add Alternate #1). f. Upgrade Architectural finishes: 1) Flooring and wall base. 2) Lighting. 3) Painting. 4) Door Hardware.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis