Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide construction of a new 3,500 SF PFAS treatment building. The new building is a free-standing steel prefabricated building that will be used to treat PFAS, set 150 from the existing building. Installation of three (3) trains of two (2) 12' dia activated carbon filter vessels are to be pre-purchased and supplied by the Owner. All other process equipment, including controls, will be provided and installed by the Contractor, as well as building construction, including electrical, plumbing, and HVAC.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The Town of Mansfield (Department of Public Works) is soliciting pre-approved contractors for improvements at the Albertini Treatment Facility, including PFAS upgrades. A non-mandatory pre-bid onsite conference is scheduled for 12/10/2025; subcontractor bids are due 12/17/2025 and general contractor bids are due 01/13/2026.
Posted Date
Nov 19, 2025
Due Date
Jan 13, 2026
Release: Nov 19, 2025
Close: Jan 13, 2026
The Town of Mansfield (Department of Public Works) is soliciting pre-approved contractors for improvements at the Albertini Treatment Facility, including PFAS upgrades. A non-mandatory pre-bid onsite conference is scheduled for 12/10/2025; subcontractor bids are due 12/17/2025 and general contractor bids are due 01/13/2026.
Premium
Access the largest public sector contact database
Work consists of the construction of MALSF system improvements and rail improvements includes approach lighting system improvements.
Posted Date
Nov 26, 2025
Due Date
Dec 18, 2025
Release: Nov 26, 2025
Close: Dec 18, 2025
Work consists of the construction of MALSF system improvements and rail improvements includes approach lighting system improvements.
AvailableProject consists of water system improvements.
Posted Date
Nov 30, 2025
Due Date
Dec 19, 2025
Release: Nov 30, 2025
Close: Dec 19, 2025
Project consists of water system improvements.
AvailableImprovements to the existing Well No. 4 pump station; improvements to two existing booster pump stations; installation of a cathodic protection system at the existing Reservoir No. 2, along with miscellaneous electrical and control improvements; construction of a new treatment building, including sodium hypochlorite and polyphosphate injection systems.
Posted Date
Nov 25, 2025
Due Date
Dec 18, 2025
Release: Nov 25, 2025
Close: Dec 18, 2025
Improvements to the existing Well No. 4 pump station; improvements to two existing booster pump stations; installation of a cathodic protection system at the existing Reservoir No. 2, along with miscellaneous electrical and control improvements; construction of a new treatment building, including sodium hypochlorite and polyphosphate injection systems.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.