Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Rosenberg
The City of Rosenberg seeks sealed proposals to clean and remove accumulated liquid sludge, grit, and sediment from one of the aeration basins at Wastewater Treatment Plant 2 in Rosenberg, Texas, with proper disposal in accordance with regulations. The basin must be fully cleaned and inspected to prepare for subsequent repair work; sludge transfer to the adjacent basin will be performed by City personnel.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
City of Rosenberg
The City of Rosenberg seeks sealed proposals to clean and remove accumulated liquid sludge, grit, and sediment from one of the aeration basins at Wastewater Treatment Plant 2 in Rosenberg, Texas, with proper disposal in accordance with regulations. The basin must be fully cleaned and inspected to prepare for subsequent repair work; sludge transfer to the adjacent basin will be performed by City personnel.
Posted Date
Nov 17, 2025
Due Date
Dec 11, 2025
Release: Nov 17, 2025
City of Rosenberg
Close: Dec 11, 2025
The City of Rosenberg seeks sealed proposals to clean and remove accumulated liquid sludge, grit, and sediment from one of the aeration basins at Wastewater Treatment Plant 2 in Rosenberg, Texas, with proper disposal in accordance with regulations. The basin must be fully cleaned and inspected to prepare for subsequent repair work; sludge transfer to the adjacent basin will be performed by City personnel.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
St. John the Baptist Parish
Provide wastewater treatment plant aeration basin rehabilitation and grit system replacement. The aeration basin air system requires a full rehabilitation. The scope of work includes: dewatering, removing and disposing the accumulated sludge, and cleaning all four cells of the aeration basin; complete replacement of all air distribution system in all four cells of the aeration basin. Once initial cleaning is complete, all remaining metal piping, fittings, and valves from the blowers to the new joints on the drop pipes in the aeration basin will be blast-cleaned and repainted. Due to the current inaccessibility of the filled cells, additional repairs to pedestals, tank walls, and floors may be required. See attached file.
Posted Date
Nov 19, 2025
Due Date
Dec 19, 2025
Release: Nov 19, 2025
St. John the Baptist Parish
Close: Dec 19, 2025
Provide wastewater treatment plant aeration basin rehabilitation and grit system replacement. The aeration basin air system requires a full rehabilitation. The scope of work includes: dewatering, removing and disposing the accumulated sludge, and cleaning all four cells of the aeration basin; complete replacement of all air distribution system in all four cells of the aeration basin. Once initial cleaning is complete, all remaining metal piping, fittings, and valves from the blowers to the new joints on the drop pipes in the aeration basin will be blast-cleaned and repainted. Due to the current inaccessibility of the filled cells, additional repairs to pedestals, tank walls, and floors may be required. See attached file.
AvailableSt. John the Baptist Parish
St. John the Baptist Parish Government solicits contractors to rehabilitate the aeration basin and replace the grit system at the River Road Wastewater Treatment Plant, providing all labor, materials, equipment, and services required by the contract documents. The solicitation was posted Nov 19, 2025 with proposals due Dec 19, 2025, and HigherGov notes it does not track documents for this opportunity and directs users to the original source link.
Posted Date
Nov 19, 2025
Due Date
Dec 19, 2025
Release: Nov 19, 2025
St. John the Baptist Parish
Close: Dec 19, 2025
St. John the Baptist Parish Government solicits contractors to rehabilitate the aeration basin and replace the grit system at the River Road Wastewater Treatment Plant, providing all labor, materials, equipment, and services required by the contract documents. The solicitation was posted Nov 19, 2025 with proposals due Dec 19, 2025, and HigherGov notes it does not track documents for this opportunity and directs users to the original source link.
AvailableCity of Fort Wayne
Water pollution control plant aeration basin diffuser improvements phase 2 as follows: the work of this contract contains upgrades to the west aeration basin complex and is generally described as follows: upgrades to the aeration diffusers and low pressure piping feeding aeration basin 7, 8, and 9; owner to furnish aeration diffusers and flow control valves. Design of pipe support and thermal expansion system. Additional upgrades of wastewater treatment facilities including structural, electrical, and instrumentation and control.
Posted Date
Nov 6, 2025
Due Date
Dec 18, 2025
Release: Nov 6, 2025
City of Fort Wayne
Close: Dec 18, 2025
Water pollution control plant aeration basin diffuser improvements phase 2 as follows: the work of this contract contains upgrades to the west aeration basin complex and is generally described as follows: upgrades to the aeration diffusers and low pressure piping feeding aeration basin 7, 8, and 9; owner to furnish aeration diffusers and flow control valves. Design of pipe support and thermal expansion system. Additional upgrades of wastewater treatment facilities including structural, electrical, and instrumentation and control.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →