Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Street sanitary sewer and water main extension, including 77 LF of 8" PVC Gravity Sewer (8-10' Deep), Complete in Place, Including Testing; 1,294 LF of 8" PVC Gravity Sewer (10-12' Deep), Complete in Place, Including Testing; 107 LF of 6" PVC Pipe for Sewer Laterals, Complete in Place; 6 ea 8" by 6" Wye Branches, Complete in Place; 6 ea 6" PVC Cap, Complete in Place; 6 ea Manholes, 48" Diameter, 0-6' Deep, Complete in Place, Including Testing; 11 VLF Manholes, 48" Diameter, Over 6' Deep, Complete in Place, Including Testing; 6 ea Manhole Frame and Cover, Heavy Traffic, Complete in Place; 1 ea Connect New Sewer to Existing Manhole, Complete in Place; 1,371 LF State Road Permanent Pavement Restoration, Complete in Place; 2,185 SY Mill & Overlay, Complete in Place; 1,543 LF of 8" Ductile Iron Water Main, Complete in Place, Including Testing; 1 ea 10" x 8" Tapping Sleeve and Valve, Complete in Place; 2 ea 8" Gate Valve with Valve Box, Complete in Place; 1 ea 10" x 8" MJ Tee, Complete in Place; 3 ea 8" x 6" MJ Tee, Complete in Place; 1 ea 8" 22.5-Degree MJ Bend, Complete in Place; 1 ea 8" DI Cap, Complete in Place; 6 ea Thrust Block, Complete in Place; 3 ea Fire Hydrant, Complete in Place, including Testing; 3 ea 8" x 6" DI Tee for Fire Hydrant, Complete in Place; 3 ea 6" Gate Valve with Valve Box, Complete in Place; 6 ea 6" DI 90-Degree Elbow, Complete in Place; 48 LF of 6" Ductile Iron Pipe to Fire Hydrants, Complete in Place, including Testing; 20 LF of 1.5" Pipe for 1 Water Service, Complete in Place, including Testing; 1 ea 1.5" Curb Box, Complete in Place; 1 ea 1.5" Curb Stop, Complete in Place; 1 ea 1.5" Corporation Stop, Complete in Place; 100 LF of 3/4" Pipe for 5 Water Services, Complete in Place, including Testing; 5 ea 3/4" Curb Box, Complete in Place; 5 ea 3/4" Curb Stop, Complete in Place; 5 ea 3/4" Corporation Stop, Complete in Place; 1,543 LF Permanent Pavement Restoration, Complete in Place.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The work includes: installation of gravity and force main sewer pipes, sewer manholes, air release manholes, pump station, trench repair, earthwork, and all associated work as shown on the contract drawings and documents. The work also includes trenching, backfilling, and road pavement repair associated with utility installation. The work includes, but is not limited to: The installation of 2,000 LF of gravity sewer, 1,530 LF of new sewer force main, installation of precast manholes, installation of residential services, and associated construction; Road repair, including the removal of bituminous pavement, trench paving, street reconstruction, loam, and seeding; Installation of the pump station, valve pit, electrical controls, emergency generator, and drive for access to the pump station.
Posted Date
Dec 8, 2025
Due Date
Jan 14, 2026
Release: Dec 8, 2025
Close: Jan 14, 2026
The work includes: installation of gravity and force main sewer pipes, sewer manholes, air release manholes, pump station, trench repair, earthwork, and all associated work as shown on the contract drawings and documents. The work also includes trenching, backfilling, and road pavement repair associated with utility installation. The work includes, but is not limited to: The installation of 2,000 LF of gravity sewer, 1,530 LF of new sewer force main, installation of precast manholes, installation of residential services, and associated construction; Road repair, including the removal of bituminous pavement, trench paving, street reconstruction, loam, and seeding; Installation of the pump station, valve pit, electrical controls, emergency generator, and drive for access to the pump station.
AvailableConstruction contract for Main Street sewer extension: install ~2,000 linear feet of gravity sewer, ~1,530 linear feet of sewer force main, precast and air release manholes, residential services, pump station (valve pit, electrical controls, emergency generator), trenching, backfill, earthwork, and road/trench paving and restoration. Requires bidder qualifications, 5% bid bond, 100% performance/payment bonds, and a mandatory pre-bid conference.
Posted Date
Dec 8, 2025
Due Date
Jan 14, 2026
Release: Dec 8, 2025
Close: Jan 14, 2026
Construction contract for Main Street sewer extension: install ~2,000 linear feet of gravity sewer, ~1,530 linear feet of sewer force main, precast and air release manholes, residential services, pump station (valve pit, electrical controls, emergency generator), trenching, backfill, earthwork, and road/trench paving and restoration. Requires bidder qualifications, 5% bid bond, 100% performance/payment bonds, and a mandatory pre-bid conference.
West cherry sanitary sewer extension project.
Posted Date
Nov 28, 2025
Due Date
Dec 16, 2025
Release: Nov 28, 2025
Close: Dec 16, 2025
West cherry sanitary sewer extension project.
AvailableWork includes : 12 EA sanitary manhole; 1 EA sanitary manhole (straddle); 13 EA manhole frame & cover; 75 LF 6" gravity sewer - sdr 26 pvc; 2,030 LF 8" gravity sewer line - sdr 35 pvc; see attached file.
Posted Date
Dec 4, 2025
Due Date
Dec 16, 2025
Release: Dec 4, 2025
Close: Dec 16, 2025
Work includes : 12 EA sanitary manhole; 1 EA sanitary manhole (straddle); 13 EA manhole frame & cover; 75 LF 6" gravity sewer - sdr 26 pvc; 2,030 LF 8" gravity sewer line - sdr 35 pvc; see attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis