Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Florence-Darlington Technical College seeks design-bid-build construction services for replacing Air Handling Equipment and VAV boxes in the 7000 Building, including necessary electrical, controls, and duct modifications.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The project consists of the replacement of AHU-1B at the UAB Highlands facility. The scope of work includes mechanical demolition and new work, as well as associated architectural and electrical modifications as required to facilitate the equipment replacement.
Posted Date
Dec 3, 2025
Due Date
Jan 29, 2026
Release: Dec 3, 2025
Close: Jan 29, 2026
The project consists of the replacement of AHU-1B at the UAB Highlands facility. The scope of work includes mechanical demolition and new work, as well as associated architectural and electrical modifications as required to facilitate the equipment replacement.
AvailablePremium
Access the largest public sector contact database
Work consists of Install new VRF system serving the HVAC needs of the 1st & 2nd Floors of the EH&S Building. Project will also repair the buildings stairs & install roof/fall protection.
Posted Date
Dec 4, 2025
Due Date
Jan 7, 2026
Release: Dec 4, 2025
Close: Jan 7, 2026
Work consists of Install new VRF system serving the HVAC needs of the 1st & 2nd Floors of the EH&S Building. Project will also repair the buildings stairs & install roof/fall protection.
AvailableProviding and installing new hybrid AHU-30, connecting to existing chilled water pipe, mounting new condensing unit on new fabricated structural.
Posted Date
Nov 7, 2025
Due Date
Dec 12, 2025
Release: Nov 7, 2025
Close: Dec 12, 2025
Providing and installing new hybrid AHU-30, connecting to existing chilled water pipe, mounting new condensing unit on new fabricated structural.
Project includes the following: (base bid): replacement of existing ahu-3 cooling coil, (from dx to chilled water) and re-piping of the chilled water system condenser side bypass with new automatic blow down valve drain valve. (alt. Bid 1): installation of tower basin cleaning system pump package, associated recirculation piping, tower sweeper jets and sweeper piping.
Posted Date
Nov 12, 2025
Due Date
Dec 18, 2025
Release: Nov 12, 2025
Close: Dec 18, 2025
Project includes the following: (base bid): replacement of existing ahu-3 cooling coil, (from dx to chilled water) and re-piping of the chilled water system condenser side bypass with new automatic blow down valve drain valve. (alt. Bid 1): installation of tower basin cleaning system pump package, associated recirculation piping, tower sweeper jets and sweeper piping.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis