Retrieving RFP details
Release
Close
City of Eatonton
Installation of approx. 11,200 LF of 6" high pressure steel gas main. The work also consists of trenched and untrenched installation, line valves, connections, and other related appurtenances.
City of Fairhope
Provide all materials, personnel, tools, equipment, pipe, welders, tap/stops, CWI, pipe size & wall thickness, verification methods, soil/hole stabilization, erosion control (temporary and permanent), trench boxes, connections, taps, sod/hay, restoration, etc. That is necessary to extend a high-pressure gas main via directional drilling. The project will be for approximately 6,000 feet of 2" steel double (.280 wall) dual coating. See attached file for full scope.
City of Arlington
Construction contract for 16" water transmission main improvements.
Town of Boonsboro
Work includes construction and installation of approx 3,270 LF of 12" DI water main, two (2) pressure reducing valves and associated appurtenances in precast concrete vaults, and connections to the existing 12" water main including 6" DI pipe and 6" and 12" gate valves. The work includes trench excavation and backfill, pipe and valve installation and testing, pipe crossing of a tributary of Antietam Creek, air release valve in manhole, site grading and restoration, storm water management devices, road paving and traffic control per SHA standards, and all appurtenances and associated work.
Release
Oct 01, 2025
Close
Nov 06, 2025