Retrieving RFP details
Release
Close
Town of Boonsboro
Work includes construction and installation of approx 3,270 LF of 12" DI water main, two (2) pressure reducing valves and associated appurtenances in precast concrete vaults, and connections to the existing 12" water main including 6" DI pipe and 6" and 12" gate valves. The work includes trench excavation and backfill, pipe and valve installation and testing, pipe crossing of a tributary of Antietam Creek, air release valve in manhole, site grading and restoration, storm water management devices, road paving and traffic control per SHA standards, and all appurtenances and associated work.
Crestview Bypass 12-Inch Water Main and Installation of Two Pressure Reducing Valves (RFP)
zip
Sweetwater Authority
Work includes 88 EA installation of prv "external"; including all labor and materials; 88 EA external installation of prv "internal"; including all labor and materials; 88 EA service charge for cancellation/rescheduling of prv installation by resident.
City of Aurora
Provide materials and labor for the east well collector combination pressure reducing & pressure sustaining valve replacement for the water treatment plant. The work includes the removal of an existing 12 inch combination pressure reducing and pressure sustaining valve for a well collector pipe within the existing City. Water Treatment Plant; providing and installing a new 12" combination pressure reducing and pressure sustaining valve; removal of existing adjoining well collector piping and fittings; providing and installing new adjoining well collector piping and fittings; removal of existing appurtenances; providing and installing new appurtenances
City of Eatonton
Installation of approx. 11,200 LF of 6" high pressure steel gas main. The work also consists of trenched and untrenched installation, line valves, connections, and other related appurtenances.
Release
Oct 15, 2025
Close
Nov 06, 2025