Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Department of Veterans Affairs (VISN-2 / Network Contract Office 02) issued Solicitation 36C24226B0021 (528A6-26-611) seeking contractors to perform asbestos abatement and related demolition work at VA facility locations in New York. The scope includes abating asbestos-containing material (ACM) pipe insulation, demolition of limited areas (e.g., plaster ceiling), removal of floor mastic and ACM in radiators, and compliance with federal/state abatement regulations and VA construction specifications. The procurement is fixed-price (NAICS 562910), requires completion within the contract timeline (21–30 days as specified in the SOW), and proposals/offers are due Dec 17, 2025, 12:30 PM EST.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Abate asbestos pipe insulation - B76. Demolish approximately 330 square feet of plaster ceiling in its entirety to include all wire mesh.
Posted Date
Nov 21, 2025
Due Date
Dec 17, 2025
Release: Nov 21, 2025
Close: Dec 17, 2025
Abate asbestos pipe insulation - B76. Demolish approximately 330 square feet of plaster ceiling in its entirety to include all wire mesh.
AvailableProvide thermal insulation sleeving, silica pipe cover.
Posted Date
Dec 4, 2025
Due Date
Dec 16, 2025
Release: Dec 4, 2025
Close: Dec 16, 2025
Provide thermal insulation sleeving, silica pipe cover.
AvailableInvitation for Bids to provide as-needed sheet metal fabrication, HVAC ductwork installation, and mechanical/pipe/duct insulation for municipal facilities (covers planned HVAC projects and repairs).
Posted Date
Dec 8, 2025
Due Date
Jan 6, 2026
Release: Dec 8, 2025
Close: Jan 6, 2026
Invitation for Bids to provide as-needed sheet metal fabrication, HVAC ductwork installation, and mechanical/pipe/duct insulation for municipal facilities (covers planned HVAC projects and repairs).
AvailableProvide sheet metal fabrication, ductwork installation, and pipe/duct insulation services for heating, ventilation, and air conditioning (HVAC). The purpose of this contract is to establish a contract with a qualified contractor who will provide sheet metal fabrication, ductwork installation, and mechanical insulation services on an as- needed basis across various municipal facilities. This contract will support both planned HVAC projects and necessary repairs related to air distribution systems and mechanical piping. See attached files.
Posted Date
Oct 20, 2025
Due Date
Jan 6, 2026
Release: Oct 20, 2025
Close: Jan 6, 2026
Provide sheet metal fabrication, ductwork installation, and pipe/duct insulation services for heating, ventilation, and air conditioning (HVAC). The purpose of this contract is to establish a contract with a qualified contractor who will provide sheet metal fabrication, ductwork installation, and mechanical insulation services on an as- needed basis across various municipal facilities. This contract will support both planned HVAC projects and necessary repairs related to air distribution systems and mechanical piping. See attached files.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis