Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Lynwood
This solicitation requests resurfacing of the Lynwood Natatorium pool, including removal of the existing interior coating, replacement or repair of damaged tiles, application of a new white pool paint finish with black lane markings, and preparation and repainting of the overflow gutter. The contractor must provide all supervision, labor, materials, equipment, and management and coordinate with the Los Angeles County Health Department to meet applicable health and safety requirements.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Ocala
Seeks the expertise of a seasoned certified pool/spa contractor to provide specialized pool deck resurfacing services. This initiative targets the resurfacing of the pool deck, breezeway, and restroom flooring with a top-tier, slip-resistant commercial-grade PVC surfacing material. The existing knock- down textured surface, installed in 2020, exhibits minor cracking, peeling, and crumbling across multiple areas, driving the need for this enhancement. The contractor is responsible for supplying and installing the new commercial-grade PVC surfacing across the pool deck, breezeway, and restrooms. A. The total resurfacing area is approximately 17,650 SF, excluding the pool itself, as derived from google maps and on-site estimates. See attached file for full scope.
Posted Date
Oct 31, 2025
Due Date
Dec 3, 2025
Release: Oct 31, 2025
City of Ocala
Close: Dec 3, 2025
Seeks the expertise of a seasoned certified pool/spa contractor to provide specialized pool deck resurfacing services. This initiative targets the resurfacing of the pool deck, breezeway, and restroom flooring with a top-tier, slip-resistant commercial-grade PVC surfacing material. The existing knock- down textured surface, installed in 2020, exhibits minor cracking, peeling, and crumbling across multiple areas, driving the need for this enhancement. The contractor is responsible for supplying and installing the new commercial-grade PVC surfacing across the pool deck, breezeway, and restrooms. A. The total resurfacing area is approximately 17,650 SF, excluding the pool itself, as derived from google maps and on-site estimates. See attached file for full scope.
AvailableCity of Clermont
Wok includes 1 LS drain and prepare main pool (including removal of tiles, plaster, and surface prep); 1 LS apply bond kote to main pool; 1 LS install new tiles, depth markers, and "no diving" markers (main pool); 1 ls install new led fixtures (main pool - 5 total); 1 LS apply exposed quartz plaster finish (main pool); 1 LS drain and prepare wading pool; 1 LS install new tiles, drain frame, and markers (wading pool); 1 LS apply exposed quartz plaster finish (wading pool); 1 LS final cleanup and site restoration.
Posted Date
Oct 31, 2025
Due Date
Dec 11, 2025
Release: Oct 31, 2025
City of Clermont
Close: Dec 11, 2025
Wok includes 1 LS drain and prepare main pool (including removal of tiles, plaster, and surface prep); 1 LS apply bond kote to main pool; 1 LS install new tiles, depth markers, and "no diving" markers (main pool); 1 ls install new led fixtures (main pool - 5 total); 1 LS apply exposed quartz plaster finish (main pool); 1 LS drain and prepare wading pool; 1 LS install new tiles, drain frame, and markers (wading pool); 1 LS apply exposed quartz plaster finish (wading pool); 1 LS final cleanup and site restoration.
AvailableCity of Greencastle
The work consists of Architectural, Structural, Mechanical (including Plumbing, Heating, Ventilation, and Sheet Metal Trades), Electrical Work, Site Work, Special Equipment (including Pool installation), Kitchen Equipment, Detention Equipment, Security Electronics and all the Work as defined on the Contract Drawings and Project Manual.
Posted Date
Nov 11, 2025
Due Date
Dec 10, 2025
Release: Nov 11, 2025
City of Greencastle
Close: Dec 10, 2025
The work consists of Architectural, Structural, Mechanical (including Plumbing, Heating, Ventilation, and Sheet Metal Trades), Electrical Work, Site Work, Special Equipment (including Pool installation), Kitchen Equipment, Detention Equipment, Security Electronics and all the Work as defined on the Contract Drawings and Project Manual.
AvailableCity of Johnson City
The City of Johnson City seeks a contractor to resurface the interior of three pools at the Memorial Park Community Center, including pressure washing, acid washing, removal of existing plaster, installation of a cementitious coating, and new plaster. The contractor must furnish all labor, materials, equipment, and insurance, and the work window is scheduled for December 29, 2025 through January 16, 2026.
Posted Date
Oct 27, 2025
Due Date
Dec 1, 2025
Release: Oct 27, 2025
City of Johnson City
Close: Dec 1, 2025
The City of Johnson City seeks a contractor to resurface the interior of three pools at the Memorial Park Community Center, including pressure washing, acid washing, removal of existing plaster, installation of a cementitious coating, and new plaster. The contractor must furnish all labor, materials, equipment, and insurance, and the work window is scheduled for December 29, 2025 through January 16, 2026.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis