Washoe County
Work inlcdes demolition of existing equipment, installation of new fixtures and controls.
e-Builder Download_251008-042835
zip
Highline College
3 EA Demo interiors of existing Wattstopper panels; 3 EA Install retrofit kits in existing enclosures; 1 EA Install/ power network cabinet; 3 EA Pull Wattstopper cable between panels; 2 EA Startup with PLS technician; 20 EA Install retrofit switches; 6 EA Install network power boosters; 1 EA Wattstopper retrofit package.
City of Fort Collins
Remove and replace the existing lighting in open work areas on the third floor
University Of California Merced
This project will replace the lighting control system and incandescent ballast and fixtures in Classroom and Office Building 1 (COB1) first floor.