Retrieving RFP details
Release
Close
University Of California Merced
This project will replace the lighting control system and incandescent ballast and fixtures in Classroom and Office Building 1 (COB1) first floor.
City of Fort Collins
Remove and replace the existing lighting in open work areas on the third floor
Palatine Public Library District
Work consists of renovation of first floor staff and meeting room spaces of the building including finishes, new exterior openings, heat pumps, plumbing, lighting, power, and low voltage systems; and coordination.
City of Hialeah
Work includes 1 EA demolition of current floor tiles and baseboards; 1 EA installation cost of floor tiles, including all required supplies, materials & labor.
Release
Oct 07, 2025
Close
Nov 05, 2025