Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Wauwatosa
Contractor shall furnish all labor, materials, supplies, equipment, tools and other services necessary for concrete sidewalk and drive approaches, ADA curb ramps and work incidental thereto within the project area that is largely bounded by Center St. to the north, Lefeber Ave. to the east, North Ave. to the south and Pasadena Blvd to the west. The work includes 1,300+ squares, 30 curb ramp reconstructions at various locations all in accordance with contract documents.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Ecorse
Approx. 2000 SF of 4" sidewalk, 2000 SF of 6" sidewalk, 1000 SY of pavement removal, with 500 SY of 8" concrete pavement, and 500 SY of 9" concrete pavement, aggregate base and other related work.
Posted Date
Oct 2, 2025
Due Date
Nov 18, 2025
Release: Oct 2, 2025
City of Ecorse
Close: Nov 18, 2025
Approx. 2000 SF of 4" sidewalk, 2000 SF of 6" sidewalk, 1000 SY of pavement removal, with 500 SY of 8" concrete pavement, and 500 SY of 9" concrete pavement, aggregate base and other related work.
City of Rochester
Hazardous sidewalk replacement program ne quadrant 2026 pahse 3.
Posted Date
Nov 17, 2025
Due Date
Dec 16, 2025
Release: Nov 17, 2025
City of Rochester
Close: Dec 16, 2025
Hazardous sidewalk replacement program ne quadrant 2026 pahse 3.
AvailableDouglas County
Sidewalk repair and curb ramp retrofit.
Posted Date
Nov 17, 2025
Due Date
Dec 9, 2025
Release: Nov 17, 2025
Douglas County
Close: Dec 9, 2025
Sidewalk repair and curb ramp retrofit.
AvailableCharter Township of Commerce
The 2026 Base Bid portion of this project will involve the removal and replacement of approximately 21,000 square feet of 4” and 6” concrete sidewalks along public township streets, including 120 root grindings, 460 horizontal saw cuts of joints, 2 ADA ramps with detectable warning surfaces, and restoration. There is also a 2-year option at the Township’s sole discretion (for years 2027 & 2028) with overall quantities similar to the 2026 Base Bid.
Posted Date
Oct 22, 2025
Due Date
Nov 18, 2025
Release: Oct 22, 2025
Charter Township of Commerce
Close: Nov 18, 2025
The 2026 Base Bid portion of this project will involve the removal and replacement of approximately 21,000 square feet of 4” and 6” concrete sidewalks along public township streets, including 120 root grindings, 460 horizontal saw cuts of joints, 2 ADA ramps with detectable warning surfaces, and restoration. There is also a 2-year option at the Township’s sole discretion (for years 2027 & 2028) with overall quantities similar to the 2026 Base Bid.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis