Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes approx. 60 TN of slurry backfill; 16 SF of 5" concrete sidewalk and driveway; 250 SF of topsoil, seed, and mulch; 30 LF of silt fence; 1 LS of traffic control; 3 SY of type R fabric; 33 CY of structural backfill; 18 CY of excavation; 144 LF of sawcutting; 6.0 TN of HMA pavement 4 LT 58-28; riprap; 168 LF of 6" perforated PVC, 4 EA of inlet protection type C; 1 EA of adjusting storm manhole. see outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This RFP is for storm damage repairs at the Manchester Fish Hatchery, including demolishing an existing lean-to storage building, constructing a new storage building (21' x 48'), and removing and replacing existing roofing components (1,500 sq ft standing seam steel roof, 50 linear ft steel facia, 35 linear ft steel roof edge).
Posted Date
-
Due Date
Jan 8, 2026
Close: Jan 8, 2026
This RFP is for storm damage repairs at the Manchester Fish Hatchery, including demolishing an existing lean-to storage building, constructing a new storage building (21' x 48'), and removing and replacing existing roofing components (1,500 sq ft standing seam steel roof, 50 linear ft steel facia, 35 linear ft steel roof edge).
Premium
Access the largest public sector contact database
This RFP is for storm damage repairs at the Manchester Fish Hatchery, including demolishing an existing lean-to storage building, constructing a new storage building (21' x 48'), and removing and replacing existing roofing components (1,500 sq ft standing seam steel roof, 50 linear ft steel facia, 35 linear ft steel roof edge).
Posted Date
-
Due Date
Jan 8, 2026
Close: Jan 8, 2026
This RFP is for storm damage repairs at the Manchester Fish Hatchery, including demolishing an existing lean-to storage building, constructing a new storage building (21' x 48'), and removing and replacing existing roofing components (1,500 sq ft standing seam steel roof, 50 linear ft steel facia, 35 linear ft steel roof edge).
AvailableConstruction of flood damage meter replacement (meter installation). Work will involve the replacement of approx. 2500 5/8" x 3/4' residential meters throughout county. Specifically, those areas impacted by the 2022 flood.
Posted Date
-
Due Date
Dec 22, 2025
Close: Dec 22, 2025
Construction of flood damage meter replacement (meter installation). Work will involve the replacement of approx. 2500 5/8" x 3/4' residential meters throughout county. Specifically, those areas impacted by the 2022 flood.
AvailableConstruction of flood damage meter replacement (meter installation). Work will involve the replacement of approx. 2500 5/8" x 3/4' residential meters throughout county. Specifically, those areas impacted by the 2022 flood.
Posted Date
-
Due Date
Dec 22, 2025
Close: Dec 22, 2025
Construction of flood damage meter replacement (meter installation). Work will involve the replacement of approx. 2500 5/8" x 3/4' residential meters throughout county. Specifically, those areas impacted by the 2022 flood.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis