Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide CDOT Bus Bridge between Hartford, CT and Springfield, MA from 4/21/26-10/30/26 requiring 4 ADA equipped motorcoaches.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Bus Bridge between Ft Worth and Marshall, TX with stops, 4 ADA equipped motorcoaches required.
Posted Date
Dec 1, 2025
Due Date
Dec 15, 2025
Release: Dec 1, 2025
Close: Dec 15, 2025
Bus Bridge between Ft Worth and Marshall, TX with stops, 4 ADA equipped motorcoaches required.
AvailablePremium
Access the largest public sector contact database
Work will include replacing the 2" bituminous concrete along the Bourne Bridge. The paving area is approx. 2,366 F by 40 F. In addition to the paving work, the contract will also include replacement of strip seals at the six bridge joints
Posted Date
Aug 7, 2025
Due Date
Dec 15, 2025
Release: Aug 7, 2025
Close: Dec 15, 2025
Work will include replacing the 2" bituminous concrete along the Bourne Bridge. The paving area is approx. 2,366 F by 40 F. In addition to the paving work, the contract will also include replacement of strip seals at the six bridge joints
AvailableThe bridge carries State Route 28, consisting of four lanes with an Annual Average Daily Traffic (AADT) of approx. 50,000 vehicles. The work of this project includes removal and replacement of the existing 2-inch thick bituminous concrete pavement wearing surface course between the north and south abutments of Bridge. The pavement on the abutments was recently replaced under a separate contract and is not included in this scope. See attached file.
Posted Date
Nov 14, 2025
Due Date
Dec 15, 2025
Release: Nov 14, 2025
Close: Dec 15, 2025
The bridge carries State Route 28, consisting of four lanes with an Annual Average Daily Traffic (AADT) of approx. 50,000 vehicles. The work of this project includes removal and replacement of the existing 2-inch thick bituminous concrete pavement wearing surface course between the north and south abutments of Bridge. The pavement on the abutments was recently replaced under a separate contract and is not included in this scope. See attached file.
AvailableProject consists of bridge preservation. See attached file.
Posted Date
Nov 10, 2025
Due Date
Dec 16, 2025
Release: Nov 10, 2025
Close: Dec 16, 2025
Project consists of bridge preservation. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis