Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Suny Stony Brook University
Purchase of water-cooled marine duty chillers.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Department of Veterans Affairs
The project to replace the end of lifecycle chillers at buildings 1, 2 and 104 shall include the following: The project shall replace the standby chiller located on the roof of building 1 above the kitchen. Replace building 2 chillers 1 and 2, modifications to chilled water piping in basement to utilize campus chilled water as backup and remove chiller 3. Replace building 104 operating room backup chiller and relocate to roof of building 104, to include additional piping to relocate chiller to roof. See attached file.
Posted Date
Nov 6, 2025
Due Date
Dec 17, 2025
Release: Nov 6, 2025
Department of Veterans Affairs
Close: Dec 17, 2025
The project to replace the end of lifecycle chillers at buildings 1, 2 and 104 shall include the following: The project shall replace the standby chiller located on the roof of building 1 above the kitchen. Replace building 2 chillers 1 and 2, modifications to chilled water piping in basement to utilize campus chilled water as backup and remove chiller 3. Replace building 104 operating room backup chiller and relocate to roof of building 104, to include additional piping to relocate chiller to roof. See attached file.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Sciences Po Uc Berkeley Dual Degree
Work include addition of a new automated logic corporation (ALC) supervisory controller and chilled water plant controller, data/ethernet is required for the controller, the supervisory and chilled water plant controller shall be installed in a new panel enclosure on the roof, extend 120 v power to the control panel, reuse existing 225A circuit breaker in switchboard '440V' to serve new chiller, replace existing 80-ton air cooled chiller CH-E with new 80-ton air cooled chiller, provide testing, adjusting, and balancing for the chilled water system
Posted Date
Nov 12, 2025
Due Date
Dec 4, 2025
Release: Nov 12, 2025
Sciences Po Uc Berkeley Dual Degree
Close: Dec 4, 2025
Work include addition of a new automated logic corporation (ALC) supervisory controller and chilled water plant controller, data/ethernet is required for the controller, the supervisory and chilled water plant controller shall be installed in a new panel enclosure on the roof, extend 120 v power to the control panel, reuse existing 225A circuit breaker in switchboard '440V' to serve new chiller, replace existing 80-ton air cooled chiller CH-E with new 80-ton air cooled chiller, provide testing, adjusting, and balancing for the chilled water system
NJ Division of Property Management & Construction
Permanent power for temporary chillers.
Posted Date
Nov 18, 2025
Due Date
Jan 6, 2026
Release: Nov 18, 2025
NJ Division of Property Management & Construction
Close: Jan 6, 2026
Permanent power for temporary chillers.
AvailableCalifornia State University San Marcos
25/26 blanket minor cap advertisement.
Posted Date
Jul 1, 2025
Due Date
Jun 30, 2026
Release: Jul 1, 2025
California State University San Marcos
Close: Jun 30, 2026
25/26 blanket minor cap advertisement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →