Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
National Guard Bureau (NGB)
Maintenance bridge painting. The principal items of work consist of: 13 LS containment system, (13 structures); 13 LS sspc, blast/prime, (13 structures); 13 LS sspc, stripe/intermediate, (13 structures); 13 LS sspc, finish, (13 structures); 3,503 SF substructure concrete repair; 9,315 SY vertical concrete sealant.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
National Guard Bureau (NGB)
Maintenance bridge painting. The principal items of work consist of: 10 LS containment system, (10 structures); 10 LS sspc, blast/prime, (10 structures); 10 LS sspc, stripe/intermediate, (10 structures); 10 LS sspc, finish, (10 structures); 4,240 SF substructure concrete repair; 6,937 SY vertical concrete sealant.
Posted Date
Nov 25, 2025
Due Date
Dec 18, 2025
Release: Nov 25, 2025
National Guard Bureau (NGB)
Close: Dec 18, 2025
Maintenance bridge painting. The principal items of work consist of: 10 LS containment system, (10 structures); 10 LS sspc, blast/prime, (10 structures); 10 LS sspc, stripe/intermediate, (10 structures); 10 LS sspc, finish, (10 structures); 4,240 SF substructure concrete repair; 6,937 SY vertical concrete sealant.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Illinois Tollway
The Illinois State Toll Highway Authority seeks bids for emergency repairs to the I-88 and Illinois Route 83 bridge, including bridge beam replacement, deck and pavement replacement, parapets, raised median work, pavement marking, and maintenance of traffic. The project is an emergency contract extension with an estimated cost of about $2,000,000 and a 90-day project duration.
Posted Date
Aug 25, 2025
Due Date
Dec 31, 2025
Release: Aug 25, 2025
Illinois Tollway
Close: Dec 31, 2025
The Illinois State Toll Highway Authority seeks bids for emergency repairs to the I-88 and Illinois Route 83 bridge, including bridge beam replacement, deck and pavement replacement, parapets, raised median work, pavement marking, and maintenance of traffic. The project is an emergency contract extension with an estimated cost of about $2,000,000 and a 90-day project duration.
AvailableConnecticut Office of the Attorney General
I-91/I-691/Route 15 Interchange Southbound Improvements in the Cities.
Posted Date
Sep 23, 2025
Due Date
Dec 10, 2025
Release: Sep 23, 2025
Connecticut Office of the Attorney General
Close: Dec 10, 2025
I-91/I-691/Route 15 Interchange Southbound Improvements in the Cities.
AvailableNew York State Thruway Authority
The New York State Thruway Authority (NYSTA) is seeking a subcontractor to provide Work Zone Traffic Control (WZTC) for survey crews on approximately eight miles of I-287 in Rockland County, providing labor, materials, machinery, tools, and equipment. The subcontractor must have relevant NYSDOT/NYSTA experience and certifications; the contract is expected to run approximately January 4, 2026 through December 31, 2026.
Posted Date
Nov 7, 2025
Due Date
Dec 1, 2025
Release: Nov 7, 2025
New York State Thruway Authority
Close: Dec 1, 2025
The New York State Thruway Authority (NYSTA) is seeking a subcontractor to provide Work Zone Traffic Control (WZTC) for survey crews on approximately eight miles of I-287 in Rockland County, providing labor, materials, machinery, tools, and equipment. The subcontractor must have relevant NYSDOT/NYSTA experience and certifications; the contract is expected to run approximately January 4, 2026 through December 31, 2026.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →