Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
National Guard Bureau (NGB)
Maintenance bridge painting. The principal items of work consist of: 10 LS containment system, (10 structures); 10 LS sspc, blast/prime, (10 structures); 10 LS sspc, stripe/intermediate, (10 structures); 10 LS sspc, finish, (10 structures); 4,240 SF substructure concrete repair; 6,937 SY vertical concrete sealant.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
National Guard Bureau (NGB)
Maintenance bridge painting. The principal items of work consist of: 13 LS containment system, (13 structures); 13 LS sspc, blast/prime, (13 structures); 13 LS sspc, stripe/intermediate, (13 structures); 13 LS sspc, finish, (13 structures); 3,503 SF substructure concrete repair; 9,315 SY vertical concrete sealant.
Posted Date
Nov 25, 2025
Due Date
Dec 16, 2025
Release: Nov 25, 2025
National Guard Bureau (NGB)
Close: Dec 16, 2025
Maintenance bridge painting. The principal items of work consist of: 13 LS containment system, (13 structures); 13 LS sspc, blast/prime, (13 structures); 13 LS sspc, stripe/intermediate, (13 structures); 13 LS sspc, finish, (13 structures); 3,503 SF substructure concrete repair; 9,315 SY vertical concrete sealant.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Illinois Tollway
The Illinois State Toll Highway Authority seeks bids for emergency repairs to the I-88 and Illinois Route 83 bridge, including bridge beam replacement, deck and pavement replacement, parapets, raised median work, pavement marking, and maintenance of traffic. The project is an emergency contract extension with an estimated cost of about $2,000,000 and a 90-day project duration.
Posted Date
Aug 25, 2025
Due Date
Dec 31, 2025
Release: Aug 25, 2025
Illinois Tollway
Close: Dec 31, 2025
The Illinois State Toll Highway Authority seeks bids for emergency repairs to the I-88 and Illinois Route 83 bridge, including bridge beam replacement, deck and pavement replacement, parapets, raised median work, pavement marking, and maintenance of traffic. The project is an emergency contract extension with an estimated cost of about $2,000,000 and a 90-day project duration.
AvailableConnecticut Office of the Attorney General
I-91/I-691/Route 15 Interchange Southbound Improvements in the Cities.
Posted Date
Sep 23, 2025
Due Date
Dec 10, 2025
Release: Sep 23, 2025
Connecticut Office of the Attorney General
Close: Dec 10, 2025
I-91/I-691/Route 15 Interchange Southbound Improvements in the Cities.
AvailableMaryland Transportation Authority
The Maryland Transportation Authority seeks bids for zone cleaning and painting of multiple box girder bridges on I-95 and I-395. The contract requires compliance with prevailing wage and apprenticeship fund contributions, includes minority business enterprise utilization goals, and will be awarded to the lowest responsive and responsible bidder.
Posted Date
Nov 6, 2025
Due Date
Dec 17, 2025
Release: Nov 6, 2025
Maryland Transportation Authority
Close: Dec 17, 2025
The Maryland Transportation Authority seeks bids for zone cleaning and painting of multiple box girder bridges on I-95 and I-395. The contract requires compliance with prevailing wage and apprenticeship fund contributions, includes minority business enterprise utilization goals, and will be awarded to the lowest responsive and responsible bidder.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →