Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Grade, drain, and surface. Work includes clearing and grubbing; 120,647 CY of unclassified excavation; 131,532 SY of solid slab sodding; 56 Acre mowing; 34,988 CY of type A aggregate base; 14,006 SY of cold milling pavement; 66,298 SY of P.C concrete pavement; 264 LF of 18" RC pipe; 424 LF of 24" RC pipe; 422 LF of 18" corrugated galvanized steel pipe; 344 LF of 18" corrugated polypropylene pipe; 1,375 LF of W-beam single beam guardrail; pavement markings. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Resurface (asphalt). Work includes 1,819 CY of unclassified borrow; 128,036 LF of machine grading; 128 Ton traffic bound surface course type E; 1,423 Gal fog seal; 8,083 Ton type S4 superpave; 6,024 Ton type 55 superpave; 72,148 SY of cold milling pavement; 64,060 LF of 4" wide traffic stripe. See attached file.
Posted Date
Dec 17, 2025
Due Date
Jan 15, 2026
Release: Dec 17, 2025
Close: Jan 15, 2026
Resurface (asphalt). Work includes 1,819 CY of unclassified borrow; 128,036 LF of machine grading; 128 Ton traffic bound surface course type E; 1,423 Gal fog seal; 8,083 Ton type S4 superpave; 6,024 Ton type 55 superpave; 72,148 SY of cold milling pavement; 64,060 LF of 4" wide traffic stripe. See attached file.
AvailableIDOT Region 5, District 9 is soliciting bids for 6.8 miles of resurfacing and ADA ramp improvements along US 51 in Perry County, from 0.2 miles north of IL 154 to Raven Road. The contract duration is 50 working days and is part of the January 16, 2026 letting scheduled for 12:00 PM. Plans and Special Provisions have not yet been posted; the project was previously advertised on November 7, 2025.
Posted Date
Nov 18, 2025
Due Date
Jan 16, 2026
Release: Nov 18, 2025
Close: Jan 16, 2026
IDOT Region 5, District 9 is soliciting bids for 6.8 miles of resurfacing and ADA ramp improvements along US 51 in Perry County, from 0.2 miles north of IL 154 to Raven Road. The contract duration is 50 working days and is part of the January 16, 2026 letting scheduled for 12:00 PM. Plans and Special Provisions have not yet been posted; the project was previously advertised on November 7, 2025.
Pedestrian and bike improvements. Work includes clearing and grubbing; 1,175 SY of solid slab sodding; 330 SY of P.C. concrete pavement; 177 LF of combined curb and gutter (6" barrier); 54 LF of combined curb and gutter (8" barrier); 1,534 SY of 4" concrete sidewalk; 15 SY Of 5" concrete sidewalk; 160 SF of tactile warning device new; 10 LF of 42"x29" corrugated galvanized steel pipe arch; 996 LF of sawing pavement. See attached file.
Posted Date
Dec 17, 2025
Due Date
Jan 15, 2026
Release: Dec 17, 2025
Close: Jan 15, 2026
Pedestrian and bike improvements. Work includes clearing and grubbing; 1,175 SY of solid slab sodding; 330 SY of P.C. concrete pavement; 177 LF of combined curb and gutter (6" barrier); 54 LF of combined curb and gutter (8" barrier); 1,534 SY of 4" concrete sidewalk; 15 SY Of 5" concrete sidewalk; 160 SF of tactile warning device new; 10 LF of 42"x29" corrugated galvanized steel pipe arch; 996 LF of sawing pavement. See attached file.
Installation of storm drain pipes, structures, and surface restoration, including dewatering, for the 900 East Storm Drain Project - Phase 2.
Posted Date
Dec 16, 2025
Due Date
Jan 22, 2026
Release: Dec 16, 2025
Close: Jan 22, 2026
Installation of storm drain pipes, structures, and surface restoration, including dewatering, for the 900 East Storm Drain Project - Phase 2.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis