Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Carroll County
Removal and replacement of existing deteriorated timber piles of structure.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Town of Dayton
Replacement of approx. 125 LF of existing 24" infiltration gallery along the bank of the tongue river, raw water pumping improvements, water treatment plant improvements, and installation of a new SCADA system.
Posted Date
Nov 10, 2025
Due Date
Dec 16, 2025
Release: Nov 10, 2025
Town of Dayton
Close: Dec 16, 2025
Replacement of approx. 125 LF of existing 24" infiltration gallery along the bank of the tongue river, raw water pumping improvements, water treatment plant improvements, and installation of a new SCADA system.
AvailableCentral California Irrigation District
DESIGN BUILD: The project generally includes: Removal of concrete baffles from the existing outlet structure. Raising existing walls by approx. 2 FT. Construction of a new cast-in-place concrete flow control structure intertying with the existing structure. New structure consists of a concrete floor and footing, and 10-FT-tall vertical walls of varying lengths and thickness as shown in the plan set. Installation of two 36" x 48" gates to be provided by the District.
Posted Date
Nov 9, 2025
Due Date
Nov 19, 2025
Release: Nov 9, 2025
Central California Irrigation District
Close: Nov 19, 2025
DESIGN BUILD: The project generally includes: Removal of concrete baffles from the existing outlet structure. Raising existing walls by approx. 2 FT. Construction of a new cast-in-place concrete flow control structure intertying with the existing structure. New structure consists of a concrete floor and footing, and 10-FT-tall vertical walls of varying lengths and thickness as shown in the plan set. Installation of two 36" x 48" gates to be provided by the District.
AvailableWisconsin Department of Transportation
Removals, grading, aggregate, structure replacement, erosion control, permanent signing, traffic control, restoration. See attached file and outside link.
Posted Date
Nov 4, 2025
Due Date
Dec 9, 2025
Release: Nov 4, 2025
Wisconsin Department of Transportation
Close: Dec 9, 2025
Removals, grading, aggregate, structure replacement, erosion control, permanent signing, traffic control, restoration. See attached file and outside link.
AvailableWisconsin Department of Transportation
Removals, grading, aggregate, structure replacement, erosion control, permanent signing, traffic control, restoration. See attached file and outside link.
Posted Date
Nov 4, 2025
Due Date
Dec 9, 2025
Release: Nov 4, 2025
Wisconsin Department of Transportation
Close: Dec 9, 2025
Removals, grading, aggregate, structure replacement, erosion control, permanent signing, traffic control, restoration. See attached file and outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis