Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Central California Irrigation District
DESIGN BUILD: The project generally includes: Removal of concrete baffles from the existing outlet structure. Raising existing walls by approx. 2 FT. Construction of a new cast-in-place concrete flow control structure intertying with the existing structure. New structure consists of a concrete floor and footing, and 10-FT-tall vertical walls of varying lengths and thickness as shown in the plan set. Installation of two 36" x 48" gates to be provided by the District.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Naval Supply Systems Command (NAVSUP)
Meter, flow rate ind, in repair/modification of, NSN 7R-6680-016168348-SX, TDP VER 001, QTY 4 Ea
Posted Date
Oct 30, 2025
Due Date
Dec 15, 2025
Release: Oct 30, 2025
Naval Supply Systems Command (NAVSUP)
Close: Dec 15, 2025
Meter, flow rate ind, in repair/modification of, NSN 7R-6680-016168348-SX, TDP VER 001, QTY 4 Ea
AvailableKentucky Transportation Cabinet
The purpose of this project is to perform upgrades to the envelope of the existing building and provide limited interior renovation. The envelope upgrades include installing a new PVC roof system over the original metal roof. Any existing skylights or ridge vents will be removed. New gutters and downspouts will terminate into existing drainpipes per site configuration. Other envelope upgrades include replacement of thirteen (13) remaining original windows with new windows and replacement of six (6) exterior doors. The interior work consists of new LVT flooring with new resilient base in two open offices. Two adjacent restrooms will have the plumbing fixtures replaced and new epoxy flooring with epoxy base. Two (2) interior doors and frames will be replaced with new. One of the restrooms will be outfitted for ADA accessibility, while the other will have the toilet partition replaced. The two front entries will have new replacement canopies, with a new canopy added at the rear of the building. Project does not include any electrical work.
Posted Date
Oct 22, 2025
Due Date
Nov 19, 2025
Release: Oct 22, 2025
Kentucky Transportation Cabinet
Close: Nov 19, 2025
The purpose of this project is to perform upgrades to the envelope of the existing building and provide limited interior renovation. The envelope upgrades include installing a new PVC roof system over the original metal roof. Any existing skylights or ridge vents will be removed. New gutters and downspouts will terminate into existing drainpipes per site configuration. Other envelope upgrades include replacement of thirteen (13) remaining original windows with new windows and replacement of six (6) exterior doors. The interior work consists of new LVT flooring with new resilient base in two open offices. Two adjacent restrooms will have the plumbing fixtures replaced and new epoxy flooring with epoxy base. Two (2) interior doors and frames will be replaced with new. One of the restrooms will be outfitted for ADA accessibility, while the other will have the toilet partition replaced. The two front entries will have new replacement canopies, with a new canopy added at the rear of the building. Project does not include any electrical work.
AvailableStrafford County
Construction of a New Warming Center Building of approx 10,000 SF and/or Demolition of the existing structure (Former site of the Cocheco Valley Humane Society).
Posted Date
Nov 12, 2025
Due Date
Dec 5, 2025
Release: Nov 12, 2025
Strafford County
Close: Dec 5, 2025
Construction of a New Warming Center Building of approx 10,000 SF and/or Demolition of the existing structure (Former site of the Cocheco Valley Humane Society).
AvailableNaval Supply Systems Command (NAVSUP)
Provide control, countermeasure, in repair/modification of, NSN 7R-5865-016531999-XE, TDP VER 001, QTY 9 Ea
Posted Date
Oct 22, 2025
Due Date
Dec 8, 2025
Release: Oct 22, 2025
Naval Supply Systems Command (NAVSUP)
Close: Dec 8, 2025
Provide control, countermeasure, in repair/modification of, NSN 7R-5865-016531999-XE, TDP VER 001, QTY 9 Ea
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis