Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Allen
City of Allen (TX) Request for Bid for full construction services to rehabilitate streets and alleys per contract plans—furnish all materials, equipment, labor and appurtenances. Solicitation requires completed bid sheet with detailed pricing, bid bond (original required for apparent low bidder), performance/payment/maintenance bonds, certificate of insurance or affidavit, bidder qualifications, references, schedule of subcontractors, and other standard contract exhibits; electronic submission via the City eBid system and a pre-bid Teams meeting are provided.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of McAllen
Work consists of street and alley rehabilitation.
Posted Date
Dec 5, 2025
Due Date
Jan 8, 2026
Release: Dec 5, 2025
City of McAllen
Close: Jan 8, 2026
Work consists of street and alley rehabilitation.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Pacific Grove
Street rehabilitation project including storm drainage and sanitary sewer system improvements. The work consists of roadway excavation, pavement grinding, grading, preparing sub-grade, placing salvaged asphaltic grindings for re-use as base material, placing Class 2 aggregate base and asphalt concrete paving for street reconstruction and overlay; construction and/or reconstruction of curb and gutter, cross gutter, sidewalk, driveway approaches and curb ramps; storm drain improvements; sanitary sewer improvements; raising/adjusting manholes, valve boxes, and utility boxes to new finished grade; traffic striping and markings and all other work.
Posted Date
Dec 6, 2025
Due Date
Jan 8, 2026
Release: Dec 6, 2025
City of Pacific Grove
Close: Jan 8, 2026
Street rehabilitation project including storm drainage and sanitary sewer system improvements. The work consists of roadway excavation, pavement grinding, grading, preparing sub-grade, placing salvaged asphaltic grindings for re-use as base material, placing Class 2 aggregate base and asphalt concrete paving for street reconstruction and overlay; construction and/or reconstruction of curb and gutter, cross gutter, sidewalk, driveway approaches and curb ramps; storm drain improvements; sanitary sewer improvements; raising/adjusting manholes, valve boxes, and utility boxes to new finished grade; traffic striping and markings and all other work.
AvailableJefferson County
Rehabilitation of approx. 859 sanitary sewer service laterals with cured-in-place liner, replacement of 172 laterals with excavation, 12,838 LF of 8" and 12" mainline cured-in-place liner, 756 vertical feet of manhole rehabilitation, 27 internal sectional liners, 636 LF of 8" sanitary sewer replacement, asphalt paving and restoration work.
Posted Date
Nov 11, 2025
Due Date
Dec 17, 2025
Release: Nov 11, 2025
Jefferson County
Close: Dec 17, 2025
Rehabilitation of approx. 859 sanitary sewer service laterals with cured-in-place liner, replacement of 172 laterals with excavation, 12,838 LF of 8" and 12" mainline cured-in-place liner, 756 vertical feet of manhole rehabilitation, 27 internal sectional liners, 636 LF of 8" sanitary sewer replacement, asphalt paving and restoration work.
AvailableCity of Laramie
Construction contract for street rehabilitation: approximately 9 lane-miles of mill-and-overlay plus associated curb & gutter, ADA ramps, and spot base repairs. Unit-price, measured-quantity contract with locations/quantities adjusted by the City; electronic bid submission via QuestCDN required; mandatory pre-bid conference; bid bond (5%) and 100% performance/payment bonds required; project manual available for $22 download fee.
Posted Date
Nov 22, 2025
Due Date
Jan 13, 2026
Release: Nov 22, 2025
City of Laramie
Close: Jan 13, 2026
Construction contract for street rehabilitation: approximately 9 lane-miles of mill-and-overlay plus associated curb & gutter, ADA ramps, and spot base repairs. Unit-price, measured-quantity contract with locations/quantities adjusted by the City; electronic bid submission via QuestCDN required; mandatory pre-bid conference; bid bond (5%) and 100% performance/payment bonds required; project manual available for $22 download fee.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.