Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 1 LS pothole to locate existing utilities; 1 LS install speed table, grind 1" and tack coat road (coag std plan 7325) (striping separate, includes all material and labor); 1 EA reset existing survey markers in concrete (allowance); 142 TON remove & replace HMA to conform to existing (1/2" hma type a pg64-10); 30 LF remove and replace HMA dike (caltrans type a); 120 sf remove & replace concrete curb ramp (caltrans type cm & g (modified), includes retaining curbs); 1,915 SF remove & replace sidewalk (coag std plan 4110); 210 SF construct raised island (caltrans type a passageway). See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The project consists of curb extensions, speed tables, crosswalk improvements, refuge island construction, landscaping, storm drain inlet improvements, sidewalk improvements, RRFBs and speed signs, and various sidewalk repair throughout the City of Arroyo Grande.
Posted Date
Dec 9, 2025
Due Date
Jan 7, 2026
Release: Dec 9, 2025
Close: Jan 7, 2026
The project consists of curb extensions, speed tables, crosswalk improvements, refuge island construction, landscaping, storm drain inlet improvements, sidewalk improvements, RRFBs and speed signs, and various sidewalk repair throughout the City of Arroyo Grande.
AvailableThe City of Punta Gorda seeks qualifications from a professional engineering firm for a master agreement to perform pedestrian engineering studies citywide and deliver pedestrian crosswalk safety improvements. The scope includes evaluation of potential pedestrian safety improvements, cost analysis, permitting, design services, and grant assistance. Proposals are due January 6, 2026 at 3:00 PM ET, with the solicitation posted December 11, 2025.
Posted Date
Dec 11, 2025
Due Date
Jan 6, 2026
Release: Dec 11, 2025
Close: Jan 6, 2026
The City of Punta Gorda seeks qualifications from a professional engineering firm for a master agreement to perform pedestrian engineering studies citywide and deliver pedestrian crosswalk safety improvements. The scope includes evaluation of potential pedestrian safety improvements, cost analysis, permitting, design services, and grant assistance. Proposals are due January 6, 2026 at 3:00 PM ET, with the solicitation posted December 11, 2025.
Highway Pedestrian Safety Improvements - Various Locations.
Posted Date
Dec 15, 2025
Due Date
Jan 22, 2026
Release: Dec 15, 2025
Close: Jan 22, 2026
Highway Pedestrian Safety Improvements - Various Locations.
AvailablePedestrian improvements. The principal items of work to be performed under the contract are: site demolition, design and installation of two pedestrian bridges, installation of concrete curb, installation of concrete sidewalks, installation of curb ramps, installation of asphalt pavement, installation of stormwater collection and conveyance facilities, fine grading and topsoil and seeding, and work of similar nature.
Posted Date
-
Due Date
Jan 15, 2026
Close: Jan 15, 2026
Pedestrian improvements. The principal items of work to be performed under the contract are: site demolition, design and installation of two pedestrian bridges, installation of concrete curb, installation of concrete sidewalks, installation of curb ramps, installation of asphalt pavement, installation of stormwater collection and conveyance facilities, fine grading and topsoil and seeding, and work of similar nature.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis