Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Borough of Palmyra
Maintenance of the borough of palmyra sewer treatment plant and collection system for the duration of 2026.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Prior Lake
Work includes approx 1 LS dewatering; 2,100 CY excavation - channel and pond; 500 CY excavation; 0.5 AC seeding. See outside link.
Posted Date
Nov 6, 2025
Due Date
Nov 24, 2025
Release: Nov 6, 2025
City of Prior Lake
Close: Nov 24, 2025
Work includes approx 1 LS dewatering; 2,100 CY excavation - channel and pond; 500 CY excavation; 0.5 AC seeding. See outside link.
AvailableCity of Woodbury
Work includes approx 0.5 AC clearing; 2 EA dewatering; 18 LF of 8" ductile iron pipe sewer. See outside link.
Posted Date
Nov 7, 2025
Due Date
Nov 24, 2025
Release: Nov 7, 2025
City of Woodbury
Close: Nov 24, 2025
Work includes approx 0.5 AC clearing; 2 EA dewatering; 18 LF of 8" ductile iron pipe sewer. See outside link.
AvailableRamsey-Washington Metro Watershed District
The Work consists of furnishing all labor, materials, equipment, skills, and performing all operations required to fully construct the Work. The Work includes, but is not limited to, mobilization and demobilization at multiple sites; installing erosion control BMPs in accordance with project SWPPP, including; silt fence, sediment logs, floatation silt curtain, inlet protection, erosion control construction entrances, control of water and/or dewatering as necessary to perform work; using mud mats for protection at access, removal of trees, stumps, vegetation, and debris; excavation/dredging/channel cleaning with off-site disposal to landfill of sediment/muck/vegetation from storm water detention ponds, channels, inlet pools, culvert ends; removal of sediment/muck/vegetation from storm water modular block paver basins with off-site disposal of materials; removal and replacement of concrete blocks, repair splash bock assemblies at raingarden edges; general site work; control of traffic at and around construction sites, site restoration/seeding with native seed mixes provided by Owner; installing erosion control blanket on all exposed soils. Clean-up of sites and removal/disposal of temporary erosion control BMPs at the completion of Work, all as provided for in the Bidding Documents. All quantities and work items in this advertisement for bid are approximate and not guaranteed.
Posted Date
Nov 14, 2025
Due Date
Dec 1, 2025
Release: Nov 14, 2025
Ramsey-Washington Metro Watershed District
Close: Dec 1, 2025
The Work consists of furnishing all labor, materials, equipment, skills, and performing all operations required to fully construct the Work. The Work includes, but is not limited to, mobilization and demobilization at multiple sites; installing erosion control BMPs in accordance with project SWPPP, including; silt fence, sediment logs, floatation silt curtain, inlet protection, erosion control construction entrances, control of water and/or dewatering as necessary to perform work; using mud mats for protection at access, removal of trees, stumps, vegetation, and debris; excavation/dredging/channel cleaning with off-site disposal to landfill of sediment/muck/vegetation from storm water detention ponds, channels, inlet pools, culvert ends; removal of sediment/muck/vegetation from storm water modular block paver basins with off-site disposal of materials; removal and replacement of concrete blocks, repair splash bock assemblies at raingarden edges; general site work; control of traffic at and around construction sites, site restoration/seeding with native seed mixes provided by Owner; installing erosion control blanket on all exposed soils. Clean-up of sites and removal/disposal of temporary erosion control BMPs at the completion of Work, all as provided for in the Bidding Documents. All quantities and work items in this advertisement for bid are approximate and not guaranteed.
AvailableBorough of Palmyra
Palmyra Borough seeks bids for the 2026 Roadway Project involving milling, paving fabric, bituminous scratch course, and wearing course on various borough roadways, with standard bid security and compliance requirements. Bids are submitted via the PennBid portal and are due on December 2, 2025; questions are due November 25, 2025.
Posted Date
Nov 6, 2025
Due Date
Dec 2, 2025
Release: Nov 6, 2025
Borough of Palmyra
Close: Dec 2, 2025
Palmyra Borough seeks bids for the 2026 Roadway Project involving milling, paving fabric, bituminous scratch course, and wearing course on various borough roadways, with standard bid security and compliance requirements. Bids are submitted via the PennBid portal and are due on December 2, 2025; questions are due November 25, 2025.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis