Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
3,435 LF - 6" DR-18 A WWA C-900 PVC, 8 EA - Fire Hydrant Assembly, 377 LF - 6" Wet Bore (Includes Certa-Lok Pipe).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes 1,800 LF of install trench excavation and safety plan and all related work; 1,800 LF of install 6" C900 DR18 PVC water line (open cut), including backfill, marking tape, tracer wire, test stations, fittings and all related work; 3 EA of install 6" existing waterline reconnection, including 6"x6" tapping sleeve, gate valve and fittings and all related work; see attached files.
Posted Date
Dec 6, 2025
Due Date
Jan 15, 2026
Release: Dec 6, 2025
Close: Jan 15, 2026
Work includes 1,800 LF of install trench excavation and safety plan and all related work; 1,800 LF of install 6" C900 DR18 PVC water line (open cut), including backfill, marking tape, tracer wire, test stations, fittings and all related work; 3 EA of install 6" existing waterline reconnection, including 6"x6" tapping sleeve, gate valve and fittings and all related work; see attached files.
Premium
Access the largest public sector contact database
Provide replacement of approx. 3,000 LF of asphalt pavement, and rehabilitation of approx. 1,000 LF of existing stormwater drainage channel. 1 LS Mobilization, Bonds, and Insurance; 1 LS Prepare, Obtain applicable approval(s) for, and Implement Stormwater Pollution Prevention Plan, and all related work, as specified; 1 LS Prepare, and Implement Traffic Control Plan, and all related work, as specified; 1 LS Furnish and install erosion control measures, and all related work, as specified; 486 GAL Furnish and install tack coat, (CCS-1H) (0.05 - 0.15 GAL/SY), and all related work, as shown and as specified; 658 TN Furnish and install HMAC Type "D" (1-1/2”) (PG 70-22) (over-lay), and all related work as shown and as specified. See attached file.
Posted Date
Nov 28, 2025
Due Date
Dec 19, 2025
Release: Nov 28, 2025
Close: Dec 19, 2025
Provide replacement of approx. 3,000 LF of asphalt pavement, and rehabilitation of approx. 1,000 LF of existing stormwater drainage channel. 1 LS Mobilization, Bonds, and Insurance; 1 LS Prepare, Obtain applicable approval(s) for, and Implement Stormwater Pollution Prevention Plan, and all related work, as specified; 1 LS Prepare, and Implement Traffic Control Plan, and all related work, as specified; 1 LS Furnish and install erosion control measures, and all related work, as specified; 486 GAL Furnish and install tack coat, (CCS-1H) (0.05 - 0.15 GAL/SY), and all related work, as shown and as specified; 658 TN Furnish and install HMAC Type "D" (1-1/2”) (PG 70-22) (over-lay), and all related work as shown and as specified. See attached file.
Provide replacement of approx. 2,900 LF of asphalt pavement and reconstruct approx. 5,800 LF of existing stormwater drainage channel. 1 LS Mobilization, Bonds, and Insurance; 1 LS Furnish and install erosion control measures, and all related work, as shown and as specified; 1 LS Prepare, and Implement Traffic Control Plan, and all related work; 6,833 SY Demolish, remove and dispose of existing asphalt pavement, and all related work, as shown and as specified; 683 GAL Furnish and install tack coat, (CCS-1H) (0.05-0.15 GAL/SY) and all related work, as shown and as specified; 196 TN Furnish and install HMAC Type "D" (PG 70-22) (pre-lay), and all related work as shown and as specified. See attached files.
Posted Date
Nov 28, 2025
Due Date
Jan 8, 2026
Release: Nov 28, 2025
Close: Jan 8, 2026
Provide replacement of approx. 2,900 LF of asphalt pavement and reconstruct approx. 5,800 LF of existing stormwater drainage channel. 1 LS Mobilization, Bonds, and Insurance; 1 LS Furnish and install erosion control measures, and all related work, as shown and as specified; 1 LS Prepare, and Implement Traffic Control Plan, and all related work; 6,833 SY Demolish, remove and dispose of existing asphalt pavement, and all related work, as shown and as specified; 683 GAL Furnish and install tack coat, (CCS-1H) (0.05-0.15 GAL/SY) and all related work, as shown and as specified; 196 TN Furnish and install HMAC Type "D" (PG 70-22) (pre-lay), and all related work as shown and as specified. See attached files.
AvailableConstruction to: replace the 24" transmission waterline; construct a new 8-in waterline; build a new sanitary sewer; transportation improvements.
Posted Date
Dec 15, 2025
Due Date
Jan 30, 2026
Release: Dec 15, 2025
Close: Jan 30, 2026
Construction to: replace the 24" transmission waterline; construct a new 8-in waterline; build a new sanitary sewer; transportation improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis