Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes mobilization / demobilization; site preparation and staking/surveying; jack-and-bore under us 231s at one location; install 12-inch water main with fittings, joints, fire hydrants, valves, air release valves, and other appurtenances, as designed. Install erosion control measures; repair disturbed soil and pavement; complete grading as designed.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes mobilization / demobilization; site preparation and staking/surveying; jack-and-bore under us 231s at one location; install 12-inch water main with fittings, joints, fire hydrants, valves, air release valves, and other appurtenances, as designed. Install erosion control measures; repair disturbed soil and pavement; complete grading as designed.
Posted Date
Dec 15, 2025
Due Date
Jan 7, 2026
Release: Dec 15, 2025
Close: Jan 7, 2026
Work includes mobilization / demobilization; site preparation and staking/surveying; jack-and-bore under us 231s at one location; install 12-inch water main with fittings, joints, fire hydrants, valves, air release valves, and other appurtenances, as designed. Install erosion control measures; repair disturbed soil and pavement; complete grading as designed.
Premium
Access the largest public sector contact database
The City of Crawfordsville is soliciting sealed bids for the Purple Heart Parkway Field Drain and Drainage Ditch Reroute Project. Work includes cutting and capping existing field tile, installing new field tile along the designed alignment, regrading a drainage swale, installing approximately 2,170 LF of 18-inch HDPE tile and 91 LF of 18-inch RCP under the proposed road, erosion control, and site restoration. A bid bond and performance/payment bonds are required; contract documents are available through DES Engineering, and a pre-bid meeting will not be required unless requested by contractors.
Posted Date
Dec 11, 2025
Due Date
Jan 7, 2026
Release: Dec 11, 2025
Close: Jan 7, 2026
The City of Crawfordsville is soliciting sealed bids for the Purple Heart Parkway Field Drain and Drainage Ditch Reroute Project. Work includes cutting and capping existing field tile, installing new field tile along the designed alignment, regrading a drainage swale, installing approximately 2,170 LF of 18-inch HDPE tile and 91 LF of 18-inch RCP under the proposed road, erosion control, and site restoration. A bid bond and performance/payment bonds are required; contract documents are available through DES Engineering, and a pre-bid meeting will not be required unless requested by contractors.
AvailableThe City of Crawfordsville is soliciting sealed bids for the Purple Heart Parkway Field Drain and Drainage Ditch Reroute Project. Work includes cutting and capping existing field tile, installing new field tile along the designed alignment, regrading a drainage swale, installing approximately 2,170 LF of 18-inch HDPE tile and 91 LF of 18-inch RCP under the proposed road, erosion control, and site restoration. A bid bond and performance/payment bonds are required; contract documents are available through DES Engineering, and a pre-bid meeting will not be required unless requested by contractors.
Posted Date
Dec 11, 2025
Due Date
Jan 7, 2026
Release: Dec 11, 2025
Close: Jan 7, 2026
The City of Crawfordsville is soliciting sealed bids for the Purple Heart Parkway Field Drain and Drainage Ditch Reroute Project. Work includes cutting and capping existing field tile, installing new field tile along the designed alignment, regrading a drainage swale, installing approximately 2,170 LF of 18-inch HDPE tile and 91 LF of 18-inch RCP under the proposed road, erosion control, and site restoration. A bid bond and performance/payment bonds are required; contract documents are available through DES Engineering, and a pre-bid meeting will not be required unless requested by contractors.
AvailableProvide construction services to install new and connect existing reclamation water main pipes, installation of a minimum of 1,800 LF of 30" dia or greater HDPE pipe via HDD.
Posted Date
Nov 14, 2025
Due Date
Jan 13, 2026
Release: Nov 14, 2025
Close: Jan 13, 2026
Provide construction services to install new and connect existing reclamation water main pipes, installation of a minimum of 1,800 LF of 30" dia or greater HDPE pipe via HDD.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis