Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes mobilization / demobilization; cutting and capping the existing field tile on both ends; replace existing field tile with a new tile along design alignment; regrade the new drainage swale along design alignment; install new 18-inch hdpe tile (approx. 2170 linear feet); install 18-inch class ii re-enforced concrete pipe (rcp) tile under proposed road (approx. 91 linear feet); install erosion control measures; repair disturbed soil; and complete grading as designed.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes mobilization / demobilization; cutting and capping the existing field tile on both ends; replace existing field tile with a new tile along design alignment; regrade the new drainage swale along design alignment; install new 18-inch hdpe tile (approx. 2170 linear feet); install 18-inch class ii re-enforced concrete pipe (rcp) tile under proposed road (approx. 91 linear feet); install erosion control measures; repair disturbed soil; and complete grading as designed.
Posted Date
Dec 11, 2025
Due Date
Jan 8, 2026
Release: Dec 11, 2025
Close: Jan 8, 2026
Work includes mobilization / demobilization; cutting and capping the existing field tile on both ends; replace existing field tile with a new tile along design alignment; regrade the new drainage swale along design alignment; install new 18-inch hdpe tile (approx. 2170 linear feet); install 18-inch class ii re-enforced concrete pipe (rcp) tile under proposed road (approx. 91 linear feet); install erosion control measures; repair disturbed soil; and complete grading as designed.
Premium
Access the largest public sector contact database
Work includes mobilization / demobilization; site preparation and staking/surveying; jack-and-bore under us 231s at one location; install 12-inch water main with fittings, joints, fire hydrants, valves, air release valves, and other appurtenances, as designed. Install erosion control measures; repair disturbed soil and pavement; complete grading as designed.
Posted Date
Dec 15, 2025
Due Date
Jan 7, 2026
Release: Dec 15, 2025
Close: Jan 7, 2026
Work includes mobilization / demobilization; site preparation and staking/surveying; jack-and-bore under us 231s at one location; install 12-inch water main with fittings, joints, fire hydrants, valves, air release valves, and other appurtenances, as designed. Install erosion control measures; repair disturbed soil and pavement; complete grading as designed.
AvailableWork includes mobilization / demobilization; site preparation and staking/surveying; jack-and-bore under us 231s at one location; install 12-inch water main with fittings, joints, fire hydrants, valves, air release valves, and other appurtenances, as designed. Install erosion control measures; repair disturbed soil and pavement; complete grading as designed.
Posted Date
Dec 15, 2025
Due Date
Jan 7, 2026
Release: Dec 15, 2025
Close: Jan 7, 2026
Work includes mobilization / demobilization; site preparation and staking/surveying; jack-and-bore under us 231s at one location; install 12-inch water main with fittings, joints, fire hydrants, valves, air release valves, and other appurtenances, as designed. Install erosion control measures; repair disturbed soil and pavement; complete grading as designed.
AvailableThe Work consists of furnishing all labor, materials, equipment, and skills, and performing all operations required for the excavation of deposited sediment in approximately 3,200 LF of drainage ditch. The Work consists of furnishing all labor, materials, equipment, and skills, and performing all operations required to construct the Work along and within the existing drainage ditch. The Work includes, but is not limited to, mobilization and demobilization; control of water to perform work; furnishing, installing, and maintaining erosion control measures, site preparation including clearing and grubbing, ditch excavation and final grading, installing one culvert, and two riprap aprons.
Posted Date
Dec 5, 2025
Due Date
Dec 23, 2025
Release: Dec 5, 2025
Close: Dec 23, 2025
The Work consists of furnishing all labor, materials, equipment, and skills, and performing all operations required for the excavation of deposited sediment in approximately 3,200 LF of drainage ditch. The Work consists of furnishing all labor, materials, equipment, and skills, and performing all operations required to construct the Work along and within the existing drainage ditch. The Work includes, but is not limited to, mobilization and demobilization; control of water to perform work; furnishing, installing, and maintaining erosion control measures, site preparation including clearing and grubbing, ditch excavation and final grading, installing one culvert, and two riprap aprons.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis