City of McHenry
Scope of work includes, but not limited to: Installation of a Cured In Place Pipe (CIPP) liner to be installed within an existing sanitary sewer. Sewer material is approx. 50 yr old clay pipe. Design of liner system and thickness. Traffic Control including flaggers and lane closures. By‐pass pumping of sewer flows. Cement spray‐on manhole lining of brick or block manholes. Cleaning and televising of the sewers before CIPP liner installation. Post installation televising and deliverables. Bid items: 5,154 LF of 8" CIPP lining sanitary; 120 Ea reinstate service lateral; 145 LF of 30" CIPP lining storm; 8 VF manhole lining. See attached file.
2025 SEWER LINING BID
Borough of Canonsburg
cleaning, jetting, and televising of 10" diameter terra cotta and PVC sanitary sewer pipes, manhole-to-manhole CIPP lining of sanitary sewers, reinstatement of sanitary laterals, and post-lining CCTV inspection. Work will also include mobilization and maintenance and protection of traffic as necessary to perform the work.
City of Aurora
Works include approx. 208 VF 4' High Priority - Full Structural Lining (Type A); 344 VF of 4' High Priority - Semi Structural Lining (Type B); 163 VF of Low Priority - Semi Structural Lining (Type B). See outside link.
City of Buffalo
Work includes approx 140 LF of 6" CIPP sanitary sewer lining; 7,445 LF of 8" CIPP sanitary sewer lining; 100 EA reinstate sanitary sewer service; 1,485 LF 10" CIPP sanitary sewer lining; 20 EA CIPP lateral connection liner; See outside link.
City of Lower Burrell
Scope of work for Contract No. 25-S2 includes complete manhole-to-manhole cured in-place lining of approximately 5,300 linear feet of 8" sanitary sewer, approximately 3 tap-in break removals, the location of existing buried manholes, as necessary, restoration of disturbed lawn and roadway areas resulting from manhole locating activities and all necessary appurtenances for said construction.
Release
Oct 15, 2025
Close
Oct 30, 2025