Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes sanitary sewer system rehabilitation, to include pipe bursting, point repairs, lateral reconnections and replacements, and manhole lining.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work, including 2,572 LF of 4”, 6”, 8”, and 10” SDR 35 PVC sanitary sewer rehabilitation, with 4’ Ø manhole cleanout and service transfers. 149 LF 12" bore, 149 LF 12" encasement, 95 LF 0-5' trenching, 237 LF asphalt pavement repair, 2 EA abandon existing sanitary sewer line, 1, 021 LF Grout, cap, and abandon existing sanitary sewer line. 8 LF fence repair, 2 EA tree removal, 1,991 LS reseeding, 40 LF 12" HDPE culvert.
Posted Date
Dec 11, 2025
Due Date
Jan 14, 2026
Release: Dec 11, 2025
Close: Jan 14, 2026
Work, including 2,572 LF of 4”, 6”, 8”, and 10” SDR 35 PVC sanitary sewer rehabilitation, with 4’ Ø manhole cleanout and service transfers. 149 LF 12" bore, 149 LF 12" encasement, 95 LF 0-5' trenching, 237 LF asphalt pavement repair, 2 EA abandon existing sanitary sewer line, 1, 021 LF Grout, cap, and abandon existing sanitary sewer line. 8 LF fence repair, 2 EA tree removal, 1,991 LS reseeding, 40 LF 12" HDPE culvert.
Premium
Access the largest public sector contact database
Sanitary sewer and manhole rehabilitation program.
Posted Date
Nov 20, 2025
Due Date
Dec 23, 2025
Release: Nov 20, 2025
Close: Dec 23, 2025
Sanitary sewer and manhole rehabilitation program.
AvailableProject consists of furnishing all labor and materials necessary for cleaning, videoing, and lining sanitary sewers using the cured-in-place pipe method and manhole rehabilitation. There is approx 5,900 LF of 8", 10", 24", and 36" sewer lines that need to be lined using the cured-in-place pipe method, and approx 100 VF of manhole that needs level c manhole rehabilitation, and one manhole to be removed and replaced with new precast concrete manhole.
Posted Date
Dec 8, 2025
Due Date
Jan 22, 2026
Release: Dec 8, 2025
Close: Jan 22, 2026
Project consists of furnishing all labor and materials necessary for cleaning, videoing, and lining sanitary sewers using the cured-in-place pipe method and manhole rehabilitation. There is approx 5,900 LF of 8", 10", 24", and 36" sewer lines that need to be lined using the cured-in-place pipe method, and approx 100 VF of manhole that needs level c manhole rehabilitation, and one manhole to be removed and replaced with new precast concrete manhole.
AvailableProject consists of furnishing all labor and materials necessary for cleaning, videoing, and lining sanitary sewers using the cured-in-place pipe method and manhole rehabilitation. There is approx 5,900 LF of 8", 10", 24", and 36" sewer lines that need to be lined using the cured-in-place pipe method, and approx 100 VF of manhole that needs level c manhole rehabilitation, and one manhole to be removed and replaced with new precast concrete manhole.
Posted Date
Dec 8, 2025
Due Date
Jan 22, 2026
Release: Dec 8, 2025
Close: Jan 22, 2026
Project consists of furnishing all labor and materials necessary for cleaning, videoing, and lining sanitary sewers using the cured-in-place pipe method and manhole rehabilitation. There is approx 5,900 LF of 8", 10", 24", and 36" sewer lines that need to be lined using the cured-in-place pipe method, and approx 100 VF of manhole that needs level c manhole rehabilitation, and one manhole to be removed and replaced with new precast concrete manhole.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis