City of Gladstone
This is stage two of four ongoing efforts to improve critical infrastructure, reduce inflow and infiltration, and address deficiencies in the aging sewer system includes East Basin sanitary sewer pipe work: 205 LF CIPP liner 15", 450 LF CIPP liner 10", 1,380 LF CIPP liner 8", 53 EA service connection restoration & sealing,
2025 Sanitary Sewer CIPP - Gladstone
zip
City of Monterey
Work includes 102 LF rehabilitate existing 8" sanitary sewer mainline by cipp method; 86 LF rehabilitate existing 10" sanitary sewer mainline by cipp method; 321 lf rehabilitate existing 18" sanitary sewer mainline by cipp method; 1,303 LF rehabilitate existing 20" sanitary sewer mainline by cipp method; 3 EA verify and robotically reinstate existing lateral with "top hat" connection for cipp; 1 EA robotically trim intruding lateral.
City of Buffalo
Work includes approx 140 LF of 6" CIPP sanitary sewer lining; 7,445 LF of 8" CIPP sanitary sewer lining; 100 EA reinstate sanitary sewer service; 1,485 LF 10" CIPP sanitary sewer lining; 20 EA CIPP lateral connection liner; See outside link.
Borough of Oakmont
Work includes heavy cleaning of sanitary sewer pipe of multiple material types pre- and post-construction CCTV in-trench replacement of sanitary sewer jack and bore installation of sanitary sewer line manhole demolition and replacement lining of sanitary sewer lines by cured-in-place-pipe (CIPP) method and all necessary appurtenances and restoration for said construction. Add Alternates will be considered for additional sanitary sewer replacement.
Montecito Sanitary District
Work includes approx. 5,227 LF of pre-rehabilitation sewer main cleaning-flushing (remaining pipelines); 5,227 LF of pre-rehabilitation sewer main CCTV inspection (Remaining Pipelines); 5,227 LF of post-rehabilitation CCTV inspection (remaining pipelines); 1,129 LF of pre-rehabilitation sewer main cleaning-flushing (MH M9M51 to M9M48); 1,129 LF of pre-rehabilitation sewer main CCTV inspection (MH M9M51 to M9M48); 1,129 LF of post-rehabilitation CCTV inspection (MH M9M51 to M9M48); 1,129 LF of rehabilitate 21" sanitary sewer pipe (MH M9M51 to M9M48); 4,890 LF of rehabilitate 21" sanitary sewer pipe (Remaining Pipelines); 337 LF of Rehabilitate 8" sanitary sewer pipe; 291 VF of rehabilitate and line existing 48" manhole (remaining manholes); 57 VF of rehabilitate and line existing 48" manhole (M9M48 through M9M51); see outside link for more details.
Release
Oct 07, 2025
Close
Oct 28, 2025