Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Repair and resurface approx. 10 miles. The scope generally consists of 1276 TONS of Road Patching by milling existing road and replacing with 4" of 19 MM Superpave Asphalt, 5,930 TNs of leveling, 123,150 SY of Double Chip and Sand Seal Surface Treatment, and 40 TNs of Asphalt Resurfacing. Project also includes traffic control, shoulder clipping, tack coat, primer, striping, shoulder restoration along with any other related accessories and appurtenances as shown on the Drawings and called for in the Contract Documents.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes approx. 1 LS traffic control, 120 TN rec asphalt concrete patching, 1,680 GLF bituminous tack coat, 2,800 SY milling asphalt concrete pavement, 1 EA adjust manhole to grade, 30,112 LF 5" white solid traffic stripe.
Posted Date
Nov 17, 2025
Due Date
Dec 18, 2025
Release: Nov 17, 2025
Close: Dec 18, 2025
Work includes approx. 1 LS traffic control, 120 TN rec asphalt concrete patching, 1,680 GLF bituminous tack coat, 2,800 SY milling asphalt concrete pavement, 1 EA adjust manhole to grade, 30,112 LF 5" white solid traffic stripe.
AvailableThe City of Kingsland, Georgia, is seeking proposals for the construction of 5' wide sidewalks using 3000 psi concrete with fiber reinforcement. The project includes compacting the base, constructing walkways with a 2% side slope, and finishing with ADA mats at intersections. Contractors must maintain liability insurance of at least $1,000,000.
Posted Date
-
Due Date
Dec 18, 2025
Release: -
Close: Dec 18, 2025
The City of Kingsland, Georgia, is seeking proposals for the construction of 5' wide sidewalks using 3000 psi concrete with fiber reinforcement. The project includes compacting the base, constructing walkways with a 2% side slope, and finishing with ADA mats at intersections. Contractors must maintain liability insurance of at least $1,000,000.
AvailableThe City of Kingsland, Georgia, is seeking proposals for the construction of 5' wide sidewalks using 3000 psi concrete with fiber reinforcement. The project includes compacting the base, constructing walkways with a 2% side slope, and finishing with ADA mats at intersections. Contractors must maintain liability insurance of at least $1,000,000.
Posted Date
-
Due Date
Dec 18, 2025
Release: -
Close: Dec 18, 2025
The City of Kingsland, Georgia, is seeking proposals for the construction of 5' wide sidewalks using 3000 psi concrete with fiber reinforcement. The project includes compacting the base, constructing walkways with a 2% side slope, and finishing with ADA mats at intersections. Contractors must maintain liability insurance of at least $1,000,000.
AvailableMorgan County Board of Commissioners is soliciting bids for the 2026 LMIG/TSPLOST Resurfacing Project to perform pavement patching, OGI, thin asphalt overlay, widening (where specified), temporary and permanent striping, and related testing and traffic control. The project is funded by Georgia DOT LMIG and local TSPLOST, requires GDOT prequalification for bidders, a 5% bid bond, insurance naming Morgan County as additionally insured, and completion by June 30, 2025 (or October 1, 2025 if an alternate bid is awarded).
Posted Date
Dec 4, 2025
Due Date
Jan 5, 2026
Release: Dec 4, 2025
Close: Jan 5, 2026
Morgan County Board of Commissioners is soliciting bids for the 2026 LMIG/TSPLOST Resurfacing Project to perform pavement patching, OGI, thin asphalt overlay, widening (where specified), temporary and permanent striping, and related testing and traffic control. The project is funded by Georgia DOT LMIG and local TSPLOST, requires GDOT prequalification for bidders, a 5% bid bond, insurance naming Morgan County as additionally insured, and completion by June 30, 2025 (or October 1, 2025 if an alternate bid is awarded).
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis