Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Cortez
Work consists of rehabilitate the concrete at the cortez recreation center natatorium slide tower. Work includes the installation and removal of temporary shoring to support structural elements vertically and install discrete galvanic anodes embedded in concrete repair or surface mounted galvanic anodes on concrete surfaces; perform batching and placement procedures for packaged concrete repair materials, concrete formwork, and finishing of concrete; establish corrosion-inhibiting coating to existing reinforcing bars and embedded steel material and perform the fabrication and installation of new epoxy-coated reinforcement as required; ensure adequate curing and protection of all concrete repairs; and the contractor must provide and properly apply traffic coating, silane water repellant, and install sealant in concrete joints
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Snohomish School District 201
Demolish existing concrete slide access tower and associated footing and construct new fiberglass (FRP hybrid) access tower with associated footing. Provide structural engineering along with deferred plan review submittal drawings. Existing fiberglass slide is to remain and be reattached to the new tower. Connect existing water line to slide assembly. Install emergency shutoff button located at the top of the tower. Demolish damaged curtain wall structural connections near the existing slide tower and replace with new ones.
Posted Date
Nov 5, 2025
Due Date
Nov 25, 2025
Release: Nov 5, 2025
Snohomish School District 201
Close: Nov 25, 2025
Demolish existing concrete slide access tower and associated footing and construct new fiberglass (FRP hybrid) access tower with associated footing. Provide structural engineering along with deferred plan review submittal drawings. Existing fiberglass slide is to remain and be reattached to the new tower. Connect existing water line to slide assembly. Install emergency shutoff button located at the top of the tower. Demolish damaged curtain wall structural connections near the existing slide tower and replace with new ones.
AvailableVictoria Regional Airport
Project includes work required to preform rehabilitation for the Air Traffic Control Tower building at Victoria Regional Airport. Work includes but is not limited to: Non-structural demolition (ceiling tiles, hvac items, plumbing items, casework), roofing items, carpentry and cabinet items, door upgrades, window glazing improvements, drywall, tiling, accoustic ceilings, flooring, paint and coatings, restroom amenities, kitchette amenities, elevator rehab, plumbing improvements, hvac improvements, electrial improvements, and security improvements.
Posted Date
Nov 15, 2025
Due Date
Dec 2, 2025
Release: Nov 15, 2025
Victoria Regional Airport
Close: Dec 2, 2025
Project includes work required to preform rehabilitation for the Air Traffic Control Tower building at Victoria Regional Airport. Work includes but is not limited to: Non-structural demolition (ceiling tiles, hvac items, plumbing items, casework), roofing items, carpentry and cabinet items, door upgrades, window glazing improvements, drywall, tiling, accoustic ceilings, flooring, paint and coatings, restroom amenities, kitchette amenities, elevator rehab, plumbing improvements, hvac improvements, electrial improvements, and security improvements.
Helix Water District
Installation of deep well anode bed, rectifier assembly, and appurtenances for an impressed current cathodic protection system.
Posted Date
Nov 7, 2025
Due Date
Dec 16, 2025
Release: Nov 7, 2025
Helix Water District
Close: Dec 16, 2025
Installation of deep well anode bed, rectifier assembly, and appurtenances for an impressed current cathodic protection system.
AvailableVillage of Downers Grove
Water tower rehabilitation.
Posted Date
Nov 10, 2025
Due Date
Dec 5, 2025
Release: Nov 10, 2025
Village of Downers Grove
Close: Dec 5, 2025
Water tower rehabilitation.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis