Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consist of 267 LF of remove concrete curb, 627 SY of remove sidewalks, driveways and retaining walls, 3 SF of remove miscellaneous concrete, 113 cy of flexible base, 1120 SY of hot mix asphalt concrete type "D",2" thickness, 67 CY of salvage, haul, stockpile asphalt concrete pavement, 1 SY of reinforced concrete pavement, 571 CY of flowable backfill, 247 LF of concrete curbing, 20 LF of concrete gutter, 349 SY of concrete sidewalks, 8 SY of concrete sidewalks. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Procurement of construction services for water distribution system upgrades, including new PVC waterlines, customer service lines, gate valves, and fire hydrants.
Posted Date
Dec 16, 2025
Due Date
Jan 27, 2026
Release: Dec 16, 2025
Close: Jan 27, 2026
Procurement of construction services for water distribution system upgrades, including new PVC waterlines, customer service lines, gate valves, and fire hydrants.
AvailableAnnual Contract for Fire Sprinkler Inspections, Repairs, and Parts Replacement for Tarrant County buildings.
Posted Date
Dec 1, 2025
Due Date
Jan 8, 2026
Release: Dec 1, 2025
Close: Jan 8, 2026
Annual Contract for Fire Sprinkler Inspections, Repairs, and Parts Replacement for Tarrant County buildings.
AvailableRelease: Dec 10, 2025
Close: Jan 7, 2026
Water Quality Analysis - Annual Contract.
AvailableContract #1: Water Distribution System Upgrades that consist of approximately 6,100 LF of 8” PVC, 13,050 LF of 6” PVC, 2,190 LF of 4” PVC, and 2,100 LF of 2” PVC Waterline. The project will also consist of approximately 3,100 LF of various sized customer service line ranging from ¾” to 1-1/2”. Approximately 210 customers will be reconnected, 45 EA Gate Valves ranging in size from 2” to 8” will be installed, 14 EA Fire Hydrants will be installed and all related appurtenances to complete the project. See outside link.
Posted Date
Oct 16, 2025
Due Date
Jan 27, 2026
Release: Oct 16, 2025
Close: Jan 27, 2026
Contract #1: Water Distribution System Upgrades that consist of approximately 6,100 LF of 8” PVC, 13,050 LF of 6” PVC, 2,190 LF of 4” PVC, and 2,100 LF of 2” PVC Waterline. The project will also consist of approximately 3,100 LF of various sized customer service line ranging from ¾” to 1-1/2”. Approximately 210 customers will be reconnected, 45 EA Gate Valves ranging in size from 2” to 8” will be installed, 14 EA Fire Hydrants will be installed and all related appurtenances to complete the project. See outside link.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis