Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes rehabilitation of existing UV system on site to bring up to industry standard and TCEQ compliance with controller; SCADA integration; alternative bid item: rehabilitation and installation of the spare UV system (owner provided) with all controls, trough, electrical, metering, etc. For a complete in place system within regulatory compliance to provide a redundant train for disinfection. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Construct and install UV equipment that was procured by the owner. This includes providing and installing fittings, flowmeters and required piping, valves, supports, and hangers and other such work as may be incidental to UV disinfection equipment installation.
Posted Date
Dec 10, 2025
Due Date
Jan 13, 2026
Release: Dec 10, 2025
Close: Jan 13, 2026
Construct and install UV equipment that was procured by the owner. This includes providing and installing fittings, flowmeters and required piping, valves, supports, and hangers and other such work as may be incidental to UV disinfection equipment installation.
AvailablePremium
Access the largest public sector contact database
The Town of Welaka, Florida is soliciting sealed bids for the construction of the FDEP WWTF Expansion & Upgrades, including a new conventional wastewater treatment facility and related work. Bidding documents are available via the engineer’s plan room or at the issuing office, and bids are due December 16, 2025 at 3:00 pm local time.
Posted Date
Nov 15, 2025
Due Date
Dec 16, 2025
Release: Nov 15, 2025
Close: Dec 16, 2025
The Town of Welaka, Florida is soliciting sealed bids for the construction of the FDEP WWTF Expansion & Upgrades, including a new conventional wastewater treatment facility and related work. Bidding documents are available via the engineer’s plan room or at the issuing office, and bids are due December 16, 2025 at 3:00 pm local time.
AvailableProject consists of the installation of new UV bulb assemblies for disinfection that the City has purchased from Trojan Technologies as the current assemblies are reaching the end of their useful life.
Posted Date
Nov 19, 2025
Due Date
Dec 17, 2025
Release: Nov 19, 2025
Close: Dec 17, 2025
Project consists of the installation of new UV bulb assemblies for disinfection that the City has purchased from Trojan Technologies as the current assemblies are reaching the end of their useful life.
AvailableWork includes construct a new 0.125 MGD conventional wastewater treatment facility (WWTF), which will include: concrete influent structure with static screen, cyclone grit removal, and flow splitting; two (2) 0.125 MGD ADF package biological treatment units (BTU No. 1) consisting of pre-anoxic, aeration, post-anoxic, re-aeration, clarification, and digester compartments each within a prestressed concrete tank; associated process pumps and blowers located outside the BTU tankage; two (2) disk-type filters in stainless steel tankage; chlorine contact chamber with two isolatable compartments constructed of poured-in-place concrete influent pump station modifications; in-plant reuse pump station; chemical feed and storage facilities; operations/control building;; modification of the existing on-site rapid infiltration basins (RIBs); yard piping; sitework; electrical/instrumentation and SCADA, including new emergency generator; associated restoration; and the demolition of the existing 0.100 MGD WWTF. Additive Alternates, which include additional WWTF upgrades and expanded treatment capacity via BTU No. 2, may be included in the project based on available budget.
Posted Date
Sep 3, 2025
Due Date
Dec 16, 2025
Release: Sep 3, 2025
Close: Dec 16, 2025
Work includes construct a new 0.125 MGD conventional wastewater treatment facility (WWTF), which will include: concrete influent structure with static screen, cyclone grit removal, and flow splitting; two (2) 0.125 MGD ADF package biological treatment units (BTU No. 1) consisting of pre-anoxic, aeration, post-anoxic, re-aeration, clarification, and digester compartments each within a prestressed concrete tank; associated process pumps and blowers located outside the BTU tankage; two (2) disk-type filters in stainless steel tankage; chlorine contact chamber with two isolatable compartments constructed of poured-in-place concrete influent pump station modifications; in-plant reuse pump station; chemical feed and storage facilities; operations/control building;; modification of the existing on-site rapid infiltration basins (RIBs); yard piping; sitework; electrical/instrumentation and SCADA, including new emergency generator; associated restoration; and the demolition of the existing 0.100 MGD WWTF. Additive Alternates, which include additional WWTF upgrades and expanded treatment capacity via BTU No. 2, may be included in the project based on available budget.