Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project consists of supplying the labor, equipment, and materials necessary to remove and replace eighteen (18) fire hydrant assemblies and twenty-two (22) water main valves of various sizes and configurations, located in thirty-five (35) separate locations.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work consists of water systems improvements - phase 3.
Posted Date
Nov 20, 2025
Due Date
Jan 29, 2026
Release: Nov 20, 2025
Close: Jan 29, 2026
Work consists of water systems improvements - phase 3.
AvailablePremium
Access the largest public sector contact database
Purchase of Valve repair feed water valve, lime systems.
Posted Date
Dec 18, 2025
Due Date
Dec 24, 2025
Release: Dec 18, 2025
Close: Dec 24, 2025
Purchase of Valve repair feed water valve, lime systems.
AvailableWet well access improvements include replacing two (2) existing 48" circular wet well manhole covers with new rectangular hatches and replacing corroded existing slide gate guides with new stainless steel guides. The valve replacement will replace five (5) existing 16-inch pump check valves and three (3) existing 6" wet well drain valves. The Work will require implementation of traffic control and temporary sewer bypass of the pump station. Other work includes concrete demolition, partial regrading of the pump station driveway, and PVC liner repair.
Posted Date
Dec 1, 2025
Due Date
Jan 26, 2026
Release: Dec 1, 2025
Close: Jan 26, 2026
Wet well access improvements include replacing two (2) existing 48" circular wet well manhole covers with new rectangular hatches and replacing corroded existing slide gate guides with new stainless steel guides. The valve replacement will replace five (5) existing 16-inch pump check valves and three (3) existing 6" wet well drain valves. The Work will require implementation of traffic control and temporary sewer bypass of the pump station. Other work includes concrete demolition, partial regrading of the pump station driveway, and PVC liner repair.
AvailableRemoval of existing 12-inch gate valve and installation of replacement 12" gate valve, 12" sleeves, spool pipe, line stops, fittings, traffic control, resurfacing and other miscellaneous and related work.
Posted Date
Dec 7, 2025
Due Date
Dec 22, 2025
Release: Dec 7, 2025
Close: Dec 22, 2025
Removal of existing 12-inch gate valve and installation of replacement 12" gate valve, 12" sleeves, spool pipe, line stops, fittings, traffic control, resurfacing and other miscellaneous and related work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis