Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes repair and resurface approx 9. 56 miles on 7 roads, consists of 315. 1 tons of road patching by milling existing road and replacing with 4" of 19 mm superpave asphalt, 57,675 sy of full depth reclamation on 6 different roads, 5,731 tons of ogi as leveling, 110,195 sy of double chip and sand seal surface treatment, and 195 tons of asphalt resurfacing, traffic control, shoulder clipping, tack coat, primer, striping, shoulder restoration along with any other related accessories and appurtenances.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Morgan County Board of Commissioners is soliciting bids for the 2026 LMIG/TSPLOST Resurfacing Project to perform pavement patching, OGI, thin asphalt overlay, widening (where specified), temporary and permanent striping, and related testing and traffic control. The project is funded by Georgia DOT LMIG and local TSPLOST, requires GDOT prequalification for bidders, a 5% bid bond, insurance naming Morgan County as additionally insured, and completion by June 30, 2025 (or October 1, 2025 if an alternate bid is awarded).
Posted Date
Dec 4, 2025
Due Date
Jan 5, 2026
Release: Dec 4, 2025
Close: Jan 5, 2026
Morgan County Board of Commissioners is soliciting bids for the 2026 LMIG/TSPLOST Resurfacing Project to perform pavement patching, OGI, thin asphalt overlay, widening (where specified), temporary and permanent striping, and related testing and traffic control. The project is funded by Georgia DOT LMIG and local TSPLOST, requires GDOT prequalification for bidders, a 5% bid bond, insurance naming Morgan County as additionally insured, and completion by June 30, 2025 (or October 1, 2025 if an alternate bid is awarded).
AvailableProject will consist of traffic control, deep patching, OGI leveling, 9.5 mm resurfacing, 12.5 mm resurfacing, full depth reclamation, rebuild shoulders and regrassing, and restriping on 2 county roads.
Posted Date
Dec 2, 2025
Due Date
Jan 21, 2026
Release: Dec 2, 2025
Close: Jan 21, 2026
Project will consist of traffic control, deep patching, OGI leveling, 9.5 mm resurfacing, 12.5 mm resurfacing, full depth reclamation, rebuild shoulders and regrassing, and restriping on 2 county roads.
AvailableUnit-price pavement resurfacing contract for Morgan County (asphalt patching, open-graded interlayer, 75# thin overlay, 2' widening, milling, striping, traffic control) on specified county roads. Bidders must be Georgia DOT prequalified; contractor-responsible testing; use hydrated lime and polymer-modified mixes; bid bond 5% required and successful bidder must provide 100% performance/payment bond; required insurance, worker's comp, and federal E-Verify. Bid tabulation shows major quantities (e.g., ~222,492 SY thin-overlay, ~4,895 TN patching) to evaluate capacity.
Posted Date
Dec 3, 2025
Due Date
Jan 5, 2026
Release: Dec 3, 2025
Close: Jan 5, 2026
Unit-price pavement resurfacing contract for Morgan County (asphalt patching, open-graded interlayer, 75# thin overlay, 2' widening, milling, striping, traffic control) on specified county roads. Bidders must be Georgia DOT prequalified; contractor-responsible testing; use hydrated lime and polymer-modified mixes; bid bond 5% required and successful bidder must provide 100% performance/payment bond; required insurance, worker's comp, and federal E-Verify. Bid tabulation shows major quantities (e.g., ~222,492 SY thin-overlay, ~4,895 TN patching) to evaluate capacity.
Work includes approx. 1 LS traffic control, 120 TN rec asphalt concrete patching, 1,680 GLF bituminous tack coat, 2,800 SY milling asphalt concrete pavement, 1 EA adjust manhole to grade, 30,112 LF 5" white solid traffic stripe.
Posted Date
Nov 17, 2025
Due Date
Dec 18, 2025
Release: Nov 17, 2025
Close: Dec 18, 2025
Work includes approx. 1 LS traffic control, 120 TN rec asphalt concrete patching, 1,680 GLF bituminous tack coat, 2,800 SY milling asphalt concrete pavement, 1 EA adjust manhole to grade, 30,112 LF 5" white solid traffic stripe.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis