Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Central Arkansas Water
Work includes approx 5,515 LF 6" DI potable water main; 4,655 LF 3" PVC potable water main. See attached file.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Bellevue
Construct approx. 8,160 LF of ductile iron water mains and appurtenances, Install two (2) PRV Vault and Appurtenances, Install new fire hydrant assemblies, Install replacement water services, Relocate existing utilities (as required), Abandon asbestos cement pipe, Restore surface conditions, including asphalt trench patching, concrete curbs, gutters and sidewalks, Perform Traffic control, Other work as required to complete the project.
Posted Date
Nov 20, 2025
Due Date
Dec 18, 2025
Release: Nov 20, 2025
City of Bellevue
Close: Dec 18, 2025
Construct approx. 8,160 LF of ductile iron water mains and appurtenances, Install two (2) PRV Vault and Appurtenances, Install new fire hydrant assemblies, Install replacement water services, Relocate existing utilities (as required), Abandon asbestos cement pipe, Restore surface conditions, including asphalt trench patching, concrete curbs, gutters and sidewalks, Perform Traffic control, Other work as required to complete the project.
AvailableCity of Naperville
The City of Naperville is soliciting bids for the 2026 Ogden Avenue Phase II Water Main Improvements involving installation of new water mains and replacement of existing mains. A non-mandatory virtual pre-bid meeting is scheduled for 2025-12-02 and bids are due on 2025-12-18.
Posted Date
Nov 18, 2025
Due Date
Dec 18, 2025
Release: Nov 18, 2025
City of Naperville
Close: Dec 18, 2025
The City of Naperville is soliciting bids for the 2026 Ogden Avenue Phase II Water Main Improvements involving installation of new water mains and replacement of existing mains. A non-mandatory virtual pre-bid meeting is scheduled for 2025-12-02 and bids are due on 2025-12-18.
AvailablePreble County
Project includes the following work: the replacement of water main, new water services, meter pits, and fire hydrants will be installed as well.
Posted Date
Nov 1, 2025
Due Date
Nov 24, 2025
Release: Nov 1, 2025
Preble County
Close: Nov 24, 2025
Project includes the following work: the replacement of water main, new water services, meter pits, and fire hydrants will be installed as well.
AvailableMadison Utilities
Approx., 5,200' of 36" FRPM or ductile iron water main with a road bore, connections to existing mains, valves, traffic control, grassing, and clean up.
Posted Date
Nov 6, 2025
Due Date
Dec 9, 2025
Release: Nov 6, 2025
Madison Utilities
Close: Dec 9, 2025
Approx., 5,200' of 36" FRPM or ductile iron water main with a road bore, connections to existing mains, valves, traffic control, grassing, and clean up.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis