Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Los Angeles
The Los Angeles Department of Water and Power (LADWP) is seeking bids to rewind boiler feed pump motors for Units 1 and 2 at the Scattergood Generating Station. Bids are to be submitted electronically through the eRSP/RAMP system and the bid document contains all submittal requirements. The solicitation is an Invitation for Bid with a due date of 2025-12-18.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
City of Los Angeles
Boiler feed pump motor rewind.
Posted Date
Nov 5, 2025
Due Date
Dec 18, 2025
Release: Nov 5, 2025
City of Los Angeles
Close: Dec 18, 2025
Boiler feed pump motor rewind.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Los Angeles Department of Water and Power
The Los Angeles Department of Water and Power (LADWP) is soliciting proposals to modernize Units 1 and 2 at the Scattergood Generating Station to be green hydrogen-ready. Bidders must submit proposals electronically through LADWP’s eRSP system and the bid due date is January 23, 2026.
Posted Date
-
Due Date
Jan 23, 2026
Los Angeles Department of Water and Power
Close: Jan 23, 2026
The Los Angeles Department of Water and Power (LADWP) is soliciting proposals to modernize Units 1 and 2 at the Scattergood Generating Station to be green hydrogen-ready. Bidders must submit proposals electronically through LADWP’s eRSP system and the bid due date is January 23, 2026.
AvailableCity of Los Angeles
Replace the generation capacity of existing scattergood units 1 and 2, which are conventional natural-gas-fired steam-boiler generators that would be removed from service, with a ccgs capable of operating on a fuel mixture of natural gas and a minimum of 30 percent hydrogen by volume. The proposed ccgs would consist of a combustion-turbine generator and a steam-turbine generator operating in tandem. Additional facilities or ancillary functions required to support the proposed ccgs include, but are not limited to, an air-cooled condenser, wet-surface air cooler, gas compressors, switchyard upgrades, and a dedicated pipeline for industrial wastewater discharge.
Posted Date
Nov 13, 2024
Due Date
Jan 23, 2026
Release: Nov 13, 2024
City of Los Angeles
Close: Jan 23, 2026
Replace the generation capacity of existing scattergood units 1 and 2, which are conventional natural-gas-fired steam-boiler generators that would be removed from service, with a ccgs capable of operating on a fuel mixture of natural gas and a minimum of 30 percent hydrogen by volume. The proposed ccgs would consist of a combustion-turbine generator and a steam-turbine generator operating in tandem. Additional facilities or ancillary functions required to support the proposed ccgs include, but are not limited to, an air-cooled condenser, wet-surface air cooler, gas compressors, switchyard upgrades, and a dedicated pipeline for industrial wastewater discharge.
AvailableDepartment of Veterans Affairs
The U.S. Department of Veterans Affairs is soliciting bids to replace Air Handling Units 1 & 2 at the Montgomery Regional Office. The contractor will provide a firm fixed price contract, verify existing conditions, and provide a one-year construction warranty while complying with VA design manuals and master specifications. Key personnel including a project manager, on-site supervisor, and quality control manager are required, and the expected project duration is 270 days.
Posted Date
Nov 24, 2025
Due Date
Dec 17, 2025
Release: Nov 24, 2025
Department of Veterans Affairs
Close: Dec 17, 2025
The U.S. Department of Veterans Affairs is soliciting bids to replace Air Handling Units 1 & 2 at the Montgomery Regional Office. The contractor will provide a firm fixed price contract, verify existing conditions, and provide a one-year construction warranty while complying with VA design manuals and master specifications. Key personnel including a project manager, on-site supervisor, and quality control manager are required, and the expected project duration is 270 days.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →