Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Huntsville
The City of Huntsville is seeking bids for the construction of the 11th Street and Hickory Drive Waterline Rehabilitation project, which includes the installation of approximately 3,500 LF of 12" PVC waterline and 7,400 LF of 8" PVC waterline, along with reconnection and relocation of existing water services and fire hydrants.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Huntsville
Work includes 6 EA furnish, install and move to active project area - project information sign; 1 LS traffic control, including but not limited to signage, control devices, temporary drainage, paving; 1 LS swppp, complete in place including reports; 7,389 LF trench safety system; 1 LS tree and plant protection; 1 AC clearing and grubbing; 5,359 SY roadway pavement removal and replacement, all pavement materials, thicknesses, gutters, curbs, sidewalk curb, subgrade; 84 SY sidewalk pavement removal and replacement; 70 SF removal and replacement concrete wheelchair ramp including headers, dowels expansion joints, staining and truncated dome pavers. See attached file.
Posted Date
Nov 13, 2025
Due Date
Dec 17, 2025
Release: Nov 13, 2025
City of Huntsville
Close: Dec 17, 2025
Work includes 6 EA furnish, install and move to active project area - project information sign; 1 LS traffic control, including but not limited to signage, control devices, temporary drainage, paving; 1 LS swppp, complete in place including reports; 7,389 LF trench safety system; 1 LS tree and plant protection; 1 AC clearing and grubbing; 5,359 SY roadway pavement removal and replacement, all pavement materials, thicknesses, gutters, curbs, sidewalk curb, subgrade; 84 SY sidewalk pavement removal and replacement; 70 SF removal and replacement concrete wheelchair ramp including headers, dowels expansion joints, staining and truncated dome pavers. See attached file.
AvailableCity of Aurora
Trenchless rehabilitation of a 24" waterline.
Posted Date
Oct 27, 2025
Due Date
Nov 24, 2025
Release: Oct 27, 2025
City of Aurora
Close: Nov 24, 2025
Trenchless rehabilitation of a 24" waterline.
AvailableCity of Laredo
Asphalt repairs for waterline replacement projects & street maintenance.
Posted Date
Nov 8, 2025
Due Date
Nov 18, 2025
Release: Nov 8, 2025
City of Laredo
Close: Nov 18, 2025
Asphalt repairs for waterline replacement projects & street maintenance.
City of Boise
Work includes: CIP rehabilitation of approx. 8 LF 8", 1,618 LF 27" and 866 LF 33" concrete sewer main using fiberglass UC CIP liner along with service reconnections, service reinstatements, and lining of existing manholes. Work is located on University Drive, with approx total footage of 2,492 LF includes 1 LS bypass sewage pumping, 1 EA cut-off protruding service, 1 EA service reinstatement w/LMK trenchess 27"x8" service line, 50 LF asbestos concrete pipe removal and disposal, 12 EA coat sanitary sewer manhole, 79 LF replacement 4" service line open-cut (pavement), 1 EA service line verification type and size, 6 EA modify manhole type 2 (major), 2,484 LF heavy cleaning (pre or post-rehabilitation) - size, 1 EA service lateral CCTV inspection-mailine launch - (pre-rehabilitation).
Posted Date
Nov 6, 2025
Due Date
Nov 19, 2025
Release: Nov 6, 2025
City of Boise
Close: Nov 19, 2025
Work includes: CIP rehabilitation of approx. 8 LF 8", 1,618 LF 27" and 866 LF 33" concrete sewer main using fiberglass UC CIP liner along with service reconnections, service reinstatements, and lining of existing manholes. Work is located on University Drive, with approx total footage of 2,492 LF includes 1 LS bypass sewage pumping, 1 EA cut-off protruding service, 1 EA service reinstatement w/LMK trenchess 27"x8" service line, 50 LF asbestos concrete pipe removal and disposal, 12 EA coat sanitary sewer manhole, 79 LF replacement 4" service line open-cut (pavement), 1 EA service line verification type and size, 6 EA modify manhole type 2 (major), 2,484 LF heavy cleaning (pre or post-rehabilitation) - size, 1 EA service lateral CCTV inspection-mailine launch - (pre-rehabilitation).
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis