Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Huntsville
Work includes 6 EA furnish, install and move to active project area - project information sign; 1 LS traffic control, including but not limited to signage, control devices, temporary drainage, paving; 1 LS swppp, complete in place including reports; 7,389 LF trench safety system; 1 LS tree and plant protection; 1 AC clearing and grubbing; 5,359 SY roadway pavement removal and replacement, all pavement materials, thicknesses, gutters, curbs, sidewalk curb, subgrade; 84 SY sidewalk pavement removal and replacement; 70 SF removal and replacement concrete wheelchair ramp including headers, dowels expansion joints, staining and truncated dome pavers. See attached file.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Huntsville
The City of Huntsville is seeking bids for the construction of the 11th Street and Hickory Drive Waterline Rehabilitation project, which includes the installation of approximately 3,500 LF of 12" PVC waterline and 7,400 LF of 8" PVC waterline, along with reconnection and relocation of existing water services and fire hydrants.
Posted Date
Nov 15, 2025
Due Date
Dec 17, 2025
Release: Nov 15, 2025
City of Huntsville
Close: Dec 17, 2025
The City of Huntsville is seeking bids for the construction of the 11th Street and Hickory Drive Waterline Rehabilitation project, which includes the installation of approximately 3,500 LF of 12" PVC waterline and 7,400 LF of 8" PVC waterline, along with reconnection and relocation of existing water services and fire hydrants.
AvailableCity of Aurora
Trenchless rehabilitation of a 24" waterline.
Posted Date
Oct 27, 2025
Due Date
Nov 24, 2025
Release: Oct 27, 2025
City of Aurora
Close: Nov 24, 2025
Trenchless rehabilitation of a 24" waterline.
AvailableCity of Greenville
The street rehabilitation work will consist of full & edge milling of approximately 52,550 square yards of existing asphalt pavement, placing approximately 7,017 tons of asphalt concrete surface course, type s 9. 5b, 2,340 tons of asphalt concrete base repairs/patching, ada improvements, curb and gutter repairs, and making necessary adjustments to valves and manholes. The street preservation work will consist of micro surfacing 46,247 square yards, rejuvenating 129,946 square yards, and crack sealing 42,400 square yards of city of greenville roads. The project also includes the placement of thermoplastic & temporary pavement markings on several streets. See attached file for full scope.
Posted Date
Oct 22, 2025
Due Date
Nov 24, 2025
Release: Oct 22, 2025
City of Greenville
Close: Nov 24, 2025
The street rehabilitation work will consist of full & edge milling of approximately 52,550 square yards of existing asphalt pavement, placing approximately 7,017 tons of asphalt concrete surface course, type s 9. 5b, 2,340 tons of asphalt concrete base repairs/patching, ada improvements, curb and gutter repairs, and making necessary adjustments to valves and manholes. The street preservation work will consist of micro surfacing 46,247 square yards, rejuvenating 129,946 square yards, and crack sealing 42,400 square yards of city of greenville roads. The project also includes the placement of thermoplastic & temporary pavement markings on several streets. See attached file for full scope.
Indian Hills General Improvement District
Work includes approx. 125,700 SF of 3 type 3 PG64-28NV AC on 6 type 11 class B aggregate base; 1,030 SF of permanent bituminous pavement patch; 440 LF of install 8" SDR-35 PVC sanitary sewer pipe; 1,450 LF of 8" cured in place liner installation; 3,280 LF of 6" restrained PVC C900 waterline and appurtenances; 25,000 SF of remove and replace PCC sidewalk; 6,130 LF of remove and replace PCC type 2 curb and gutter (24" wide); see outside link for more details.
Posted Date
Oct 21, 2025
Due Date
Dec 3, 2025
Release: Oct 21, 2025
Indian Hills General Improvement District
Close: Dec 3, 2025
Work includes approx. 125,700 SF of 3 type 3 PG64-28NV AC on 6 type 11 class B aggregate base; 1,030 SF of permanent bituminous pavement patch; 440 LF of install 8" SDR-35 PVC sanitary sewer pipe; 1,450 LF of 8" cured in place liner installation; 3,280 LF of 6" restrained PVC C900 waterline and appurtenances; 25,000 SF of remove and replace PCC sidewalk; 6,130 LF of remove and replace PCC type 2 curb and gutter (24" wide); see outside link for more details.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis