Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Pleasant Grove City Public Works & Engineering seeks bids for the 1100 East Area Waterline and Roadway Reconstruction project to remove and replace approximately 3,913 linear feet of culinary waterline and reconstruct roughly 19,401 square yards of roadway across multiple streets. The procurement is an IFB requiring licensed, bonded, and insured contractors (with specified experience and self-performance requirements); sealed bids are due on December 11, 2025, with work expected to start after March 1, 2026 and substantial completion by September 15, 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Pleasant Grove City seeks qualified individuals or companies for the construction and reconstruction of the 1100 East Area Water Line and Roadway, involving removal and replacement of 3,913 linear feet of culinary waterline, and 19,401 square yards of asphalt removal, base supplementation, and asphalt placement.
Posted Date
-
Due Date
Dec 11, 2025
Close: Dec 11, 2025
Pleasant Grove City seeks qualified individuals or companies for the construction and reconstruction of the 1100 East Area Water Line and Roadway, involving removal and replacement of 3,913 linear feet of culinary waterline, and 19,401 square yards of asphalt removal, base supplementation, and asphalt placement.
Work consists of the replacement of approx 1,130 LF of 6" cast iron waterline with 8-inch ductile iron pipe from Weber Avenue NE west along 9th Street NE then through an off-road easement to Woodside Avenue NE. Approx 815 LF of 9th Street NE will then be reconstructed from Weber west to the cul-de-sac including new 304 aggregate, full depth asphalt pavement, concrete driveway aprons, and concrete curb and gutter.
Posted Date
Dec 4, 2025
Due Date
Dec 19, 2025
Release: Dec 4, 2025
Close: Dec 19, 2025
Work consists of the replacement of approx 1,130 LF of 6" cast iron waterline with 8-inch ductile iron pipe from Weber Avenue NE west along 9th Street NE then through an off-road easement to Woodside Avenue NE. Approx 815 LF of 9th Street NE will then be reconstructed from Weber west to the cul-de-sac including new 304 aggregate, full depth asphalt pavement, concrete driveway aprons, and concrete curb and gutter.
AvailableConstruction of Redwash Road: removal and replacement of ~4.6 miles of roadway including widening, culverts, retaining walls, guard rails, delineator posts, and signs. Bids are tied to a concurrent Redwash Road waterline project and bidders must bid both tied projects; attendance at a mandatory pre-bid conference is required. Owner estimates total bid price ≈ $21,000,000 and expects completion by 2026-09-30.
Posted Date
Nov 25, 2025
Due Date
Dec 22, 2025
Release: Nov 25, 2025
Close: Dec 22, 2025
Construction of Redwash Road: removal and replacement of ~4.6 miles of roadway including widening, culverts, retaining walls, guard rails, delineator posts, and signs. Bids are tied to a concurrent Redwash Road waterline project and bidders must bid both tied projects; attendance at a mandatory pre-bid conference is required. Owner estimates total bid price ≈ $21,000,000 and expects completion by 2026-09-30.
The project consist of approx 7,389 LF complete in place trench safety system; 5,359 SY Roadway Pavement Removal and Replacement, all pavement materials, thicknesses, gutters, curbs, sidewalk curb, subgrade, and etc. Replace to match existing, and in accordance with construction specifications and details, complete in place; 84 SY Sidewalk Pavement Removal and Replacement, complete in place; 2,433 LF 12" waterline via open cut; 581 LF 8" waterline in steel casing by trenchless construction.
Posted Date
Nov 13, 2025
Due Date
Dec 17, 2025
Release: Nov 13, 2025
Close: Dec 17, 2025
The project consist of approx 7,389 LF complete in place trench safety system; 5,359 SY Roadway Pavement Removal and Replacement, all pavement materials, thicknesses, gutters, curbs, sidewalk curb, subgrade, and etc. Replace to match existing, and in accordance with construction specifications and details, complete in place; 84 SY Sidewalk Pavement Removal and Replacement, complete in place; 2,433 LF 12" waterline via open cut; 581 LF 8" waterline in steel casing by trenchless construction.