Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes building b elevator modernization. This shall include the working integration of all power, controls, fire alarm, access control and other ancillary systems necessary for a fully functional, warrantable and code compliant installation.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Modernization of the overhead traction elevator in the chemical building at the water treatment plant. Work includes removing all existing elevator equipment except the main guide rails and counterweight rails, and installing: new elevator cab. New hoistway door equipment and tracks. New signal fixtures new landing systems. New hoistway and car wiring. All related building, mechanical, electrical, and life-safety upgrades needed to bring the system into compliance with current local codes.
Posted Date
Nov 26, 2025
Due Date
Jan 7, 2026
Release: Nov 26, 2025
Close: Jan 7, 2026
Modernization of the overhead traction elevator in the chemical building at the water treatment plant. Work includes removing all existing elevator equipment except the main guide rails and counterweight rails, and installing: new elevator cab. New hoistway door equipment and tracks. New signal fixtures new landing systems. New hoistway and car wiring. All related building, mechanical, electrical, and life-safety upgrades needed to bring the system into compliance with current local codes.
Premium
Access the largest public sector contact database
The project modernizes the overhead traction elevator in the Chemical Building at the Fleur Drive Water Treatment Plant, removing all elevator equipment except main guide rails and counterweight rails and installing new cab, hoistway doors, signal fixtures, landing systems, wiring, and required building/mechanical/electrical/life-safety upgrades to meet current local codes. The solicitation is issued by the entity responsible for the Fleur Drive Water Treatment Plant (Des Moines Water Works) and solicits contractors to perform the elevator modernization work.
Posted Date
Nov 26, 2025
Due Date
Jan 7, 2026
Release: Nov 26, 2025
Close: Jan 7, 2026
The project modernizes the overhead traction elevator in the Chemical Building at the Fleur Drive Water Treatment Plant, removing all elevator equipment except main guide rails and counterweight rails and installing new cab, hoistway doors, signal fixtures, landing systems, wiring, and required building/mechanical/electrical/life-safety upgrades to meet current local codes. The solicitation is issued by the entity responsible for the Fleur Drive Water Treatment Plant (Des Moines Water Works) and solicits contractors to perform the elevator modernization work.
AvailableWork includes ch-elevator modernization.
Posted Date
Dec 11, 2025
Due Date
Jan 27, 2026
Release: Dec 11, 2025
Close: Jan 27, 2026
Work includes ch-elevator modernization.
AvailableModernization of two existing elevator systems to extend their useful life and provide safe, efficient, and comfortable vertical transportation for building occupants.
Posted Date
Nov 26, 2025
Due Date
Jan 6, 2026
Release: Nov 26, 2025
Close: Jan 6, 2026
Modernization of two existing elevator systems to extend their useful life and provide safe, efficient, and comfortable vertical transportation for building occupants.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis