Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Illinois DOT is soliciting bids for a 1.19-mile designed overlay project on US 6 (Channahon Road) in the City of Joliet, Will County. The work consists of resurfacing the existing HMA pavement with HMA surface and binder course and associated thermoplastic pavement markings. Bids are due at the January 16, 2026 letting at 12:00 PM (CT).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
IDOT is soliciting bids for a 0.46-mile designed overlay on US 45 (Lake Street) in Libertyville, Lake County. Work includes HMA surface removal, depth patches, curb and gutter spot repairs, cold milling and inlay resurfacing, and new thermoplastic pavement markings. The project is in District 1, with bids due at the January 16, 2026 letting at 12:00 PM Central Time.
Posted Date
Nov 19, 2025
Due Date
Jan 16, 2026
Premium
Access the largest public sector contact database
IDOT is soliciting bids for a 0.46-mile designed overlay on US 45 (Lake Street) in Libertyville, Lake County. Work includes HMA surface removal, depth patches, curb and gutter spot repairs, cold milling and inlay resurfacing, and new thermoplastic pavement markings. The project is in District 1, with bids due at the January 16, 2026 letting at 12:00 PM Central Time.
IDOT is soliciting bids for a designed overlay, milling, and patching project from Emerson Road to Galt Road and the US 30 Connector in Whiteside County. The work includes milling, HMA surface and binder courses, patching, pavement markings, traffic control, and related items over approximately 4.29 miles on I-88/US 30 routes. Bids are due at the January 16, 2026 letting at 12:00 PM (CT).
Posted Date
Nov 25, 2025
Due Date
Jan 16, 2026
Release: Nov 25, 2025
Close: Jan 16, 2026
IDOT is soliciting bids for a designed overlay, milling, and patching project from Emerson Road to Galt Road and the US 30 Connector in Whiteside County. The work includes milling, HMA surface and binder courses, patching, pavement markings, traffic control, and related items over approximately 4.29 miles on I-88/US 30 routes. Bids are due at the January 16, 2026 letting at 12:00 PM (CT).
AvailableIllinois Department of Transportation is letting Contract 187-66N78 for 5.8 miles of milling and resurfacing (designed overlay) on IL 29/26 and SBI 29 in Bureau County. The project includes ditch cleaning, pipe culvert replacement, guardrail as applicable, pavement marking, and raised reflective pavement markers. Work limits span FAS 318 (IL 29), SBI 29 A (IL 29), and FAS 2245 (IL 29/26), from the Putnam County line to south of Kansas St. in Bureau Junction, plus SBI 29 (OR 29) from IL 29 to dead end.
Posted Date
Nov 18, 2025
Due Date
Jan 16, 2026
Release: Nov 18, 2025
Close: Jan 16, 2026
Illinois Department of Transportation is letting Contract 187-66N78 for 5.8 miles of milling and resurfacing (designed overlay) on IL 29/26 and SBI 29 in Bureau County. The project includes ditch cleaning, pipe culvert replacement, guardrail as applicable, pavement marking, and raised reflective pavement markers. Work limits span FAS 318 (IL 29), SBI 29 A (IL 29), and FAS 2245 (IL 29/26), from the Putnam County line to south of Kansas St. in Bureau Junction, plus SBI 29 (OR 29) from IL 29 to dead end.
AvailableIllinois Department of Transportation is soliciting bids for a 1.08-mile standard overlay and ADA improvements project on US 45 (Lake Street) from IL 176 (Maple Avenue) to Woodlawn Drive in the Village of Mundelein, Lake County. The work includes HMA surface removal and inlay, Class D full-depth patches, curb and gutter spot repairs, ADA curb ramp sidewalk replacement, drainage structure adjustments/cleaning, thermoplastic pavement markings, raised reflective pavement markers, accessible pedestrian signal improvements, and detector loops. The contract is set for the January 16, 2026 letting and specifies 60 working days.
Posted Date
Nov 7, 2025
Due Date
Jan 16, 2026
Release: Nov 7, 2025
Close: Jan 16, 2026
Illinois Department of Transportation is soliciting bids for a 1.08-mile standard overlay and ADA improvements project on US 45 (Lake Street) from IL 176 (Maple Avenue) to Woodlawn Drive in the Village of Mundelein, Lake County. The work includes HMA surface removal and inlay, Class D full-depth patches, curb and gutter spot repairs, ADA curb ramp sidewalk replacement, drainage structure adjustments/cleaning, thermoplastic pavement markings, raised reflective pavement markers, accessible pedestrian signal improvements, and detector loops. The contract is set for the January 16, 2026 letting and specifies 60 working days.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis