Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction area signs; portable radar speed feedback sign system; street sweeping; 2,410 CY roadway excavation; 15 ea plant (group b); 870 SF gravel mulch.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The California Department of Transportation (Caltrans) is soliciting bids for a highway construction project in El Dorado County in and near Placerville along Route 50. Work includes cold planing asphalt concrete pavement, hot mix asphalt (HMA), reinforced concrete pipe (RCP), concrete barrier, and structural concrete. The contract is estimated at $40,000,000 with 250 working days and requires a Class A license or a combination of C-12 and C-8.
Posted Date
Sep 29, 2025
Due Date
Jan 7, 2026
Release: Sep 29, 2025
Close: Jan 7, 2026
The California Department of Transportation (Caltrans) is soliciting bids for a highway construction project in El Dorado County in and near Placerville along Route 50. Work includes cold planing asphalt concrete pavement, hot mix asphalt (HMA), reinforced concrete pipe (RCP), concrete barrier, and structural concrete. The contract is estimated at $40,000,000 with 250 working days and requires a Class A license or a combination of C-12 and C-8.
Premium
Access the largest public sector contact database
Hma, rhma, jpcp, jpcp(rsc), and individual slab replacement (rsc).
Posted Date
Oct 27, 2025
Due Date
Dec 18, 2025
Release: Oct 27, 2025
Close: Dec 18, 2025
Hma, rhma, jpcp, jpcp(rsc), and individual slab replacement (rsc).
AvailableConstruction area signs; 52,786 CF structural concrete, bridge (repair) (cf); 183,218 SF fiber reinforced polymer system (pile).
Posted Date
Sep 29, 2025
Due Date
Dec 18, 2025
Release: Sep 29, 2025
Close: Dec 18, 2025
Construction area signs; 52,786 CF structural concrete, bridge (repair) (cf); 183,218 SF fiber reinforced polymer system (pile).
AvailablePortable radar speed feedback sign system; street sweeping; 7,060 CY roadway excavation; 2,040 CY class 2 aggregate base (cy).
Posted Date
Sep 29, 2025
Due Date
Dec 7, 2026
Release: Sep 29, 2025
Close: Dec 7, 2026
Portable radar speed feedback sign system; street sweeping; 7,060 CY roadway excavation; 2,040 CY class 2 aggregate base (cy).
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis